Laserfiche WebLink
JINN-19-02 04:47PM FROWMI CROSEPTE� 9498553515 t 1 T-794 P.02/08 F-380 <br /> Maintenance Monitoring and Warraa <br /> .included in the purchase price of the EnviroServer are the first two years of monitoring and <br /> warranty of all parts. The EnviroServer is monitored 2417 at the MicroSepTec Performance <br /> E Assurance Center,thus guaranteeing 4 worry free, flush and forget system. A $78 dollar per <br /> month monitoring fee is assessed thereafter. <br /> 1 <br /> 1 <br /> System Costs: <br /> 1: ane EnviroServer 600 gallons per day wastewater treatment system, $12,900 <br /> including tank,air compressors and controller. <br /> 2. Sales tax on$10,90QZ 7.75%.. $999.75 <br /> 3. Delivery of tbe.above materials to the installation.site_ $1,100 <br /> 4. Engineering fee for sepue perp it submittal to the San Joaquin, $1,000 <br /> Department Environmental Health (optional) <br /> 5. Two days of on-site installation supervision by a qualified MicroSepTec $1,500 <br /> representative (additional days will be billed at$5 00 per day). i <br /> i <br /> Total cost for the MicroSepTec EnviroServer wastewater treatment system is. $37,499.75 <br /> C <br /> Installation labor, material, equipment,and pea gravel are not included in this proposal. This <br /> should be provided in a separate contract with a licensed contractor. All permit application fees <br /> are not part of this proposal_ The client will be responsible for paying the permit application fee <br /> directly to the county at the time of permit submittal. ,-kny additional soil suitability testing, i <br /> seepage pit/percolation testing,if any,are not part of this proposal. MicroSepTec is the j <br /> manufacturer of the EmdroServer. MicroSepTec is not a licensed contractor and is not providing <br /> 1 <br /> contracting services. I <br /> MicroSepTec payment schedule: <br /> „$5,250 Upon acceptance of this contract <br /> $12,249.75 Balance, ten business days prior to shipment i <br /> i <br /> i <br />