Laserfiche WebLink
May-08-00 10:050 cardowan <br /> 2098356618 P-03 <br /> y <br /> i <br /> AVID FARR - ARCHITECT <br /> 1 1 WEST FULTON STREET STOCKTON,CA.95204 209-463-2267 <br /> TV y 5,2040 <br /> wan Construction Co.,Inc. <br /> 1 West 01 Street,Ste C <br /> T acy Ca. 95376 <br /> A�tn- Carl Gowan <br /> Rk 1 ld`Street Development <br /> , <br /> Tracy,Ca. <br /> S TE DEVELOPMENT CALCULATIONS: <br /> B ilding Arca: <br /> 1. Retail 5,00D S.f. <br /> 2. OfEcc 2,000 SI <br /> 3. Warehouse 3,000 s.f <br /> Total 10,000 S1 <br /> P�rking Required: <br /> 1. Retail(500011000 x 4)+(.67/employee x 5) = 23.4 <br /> 2. Office(200011000 x 3.3)= 6.6 <br /> 3. Warehouse(3000/1000x.5)+(-5/employee x 5)= 4.0 <br /> Total 32.0 <br /> Ifinding Area Required: -- <br /> 1 f <br /> ` Paving: 13,870 x 95 x .16= 2,108 <br /> t Building Roof i 0,000 x .80 x .16= 1,280 <br /> Lawn/Landscape: 4,500 x.20 x.16= 144 <br /> Pond Basin: 1,800 x 1 x .16= 288 <br /> t 3820c.f <br /> Total <br /> Pond Depth: 3820/1800= 2.12 ft. <br /> E rid of Calculations <br /> S ly, <br /> vid Fart--Architect <br /> r <br />