Laserfiche WebLink
h <br /> S = Sufficient <br /> I = Insufficient <br /> S I 6.0 PERCOLATION TEST INFORMATION SECTION <br /> `� ❑ 6.1 Site map shhowing he to on,with concise and accurate dimensions of the percolation test holes on the parcel. <br /> ® E] 6.2 The minimum number of shallow and deep percolation tests was performed for each parcel. <br /> ❑ 6.3 DescripUan of the date,time and protocol used to prepare the test hole, including depth and dimensions of hole, <br /> preparation of hole,and depth of water used to presoak(minimum 12 inches). <br /> ❑ 6.4 DescripAn of the date,time and condition of the test hole after the 24-hour soak period(hole still intact,hole dry, <br /> depth to watpr remaining in hole,etc.) <br /> 21 El6.5 The test gnformed to SJC Policy EHD 02-02(correct depth,diameter, 2"gravel,6"water refill, correct readings <br /> recorded). 3 <br /> ❑ 6.6 Complete Pdreolation Test Form(including readings)was provided with REHS verification signature. The rate <br /> was correcAy calculated using the last reading. <br /> [� ❑ 6.7 Discu4 of any ential problems predicted and/or the need for an engineered or alternative septic system. k <br /> ❑ 6.8 Discussion of percolation rates in relation to the type,size and location of future leach fields needed at the site. <br /> 7.0 CONCLUSION SECTION <br /> ❑ 7.1 The report was signed and stamped by the appropriately registered individual <br /> Reviewed By: Reviewed Date: <br /> I <br /> 4 <br /> EHD 26-02-003 Page 2 of 3 Soil Suitability Checklist <br /> �t A 1'1M1Il'] <br />