Laserfiche WebLink
Supplement No..1 to Pra� ure 718 page 1 <br /> 1: Requests for encroachment rights or for other uses of the District's aqueduct properties <br /> shall be directed to the Manager of Water Supply Division, P.O. Box 228, Stockton, <br /> California 95201. Property uses shall only be permitted subject to appropriate written <br /> permit, license, easement, or lease agreement. <br /> �i <br /> 2. Requests for property uses.shall be in writing and accompanied by a completed application, <br /> plan and profile drawings, in triplicate, of the area and work involved. District aqueduct <br /> stationing and adjacent above ground structures must be shown. Applicant's horizontal and <br /> vertical control must be correlated to the District's. <br /> 3. The applicant must agree to indemnify and hold harmless the District from any loss, claim, <br /> or liability which may arise by reason of applicant's use of District property and may be <br /> required to provide insurance coverage. <br /> 4. District land and facilities shall be restored to a condition as good as that which existed <br /> before applicant's entry on the right-of-way. <br /> 5. Applicant's use of property shall not increase District costs or interfere with District access, <br /> operations, maintenance, or repair of its facilities. <br /> 6. The applicant must pay the District the appraised value of the easement or lease, if <br /> appropriate, for the rights granted to him. Appropriate environmental documentation must <br /> be completed in accordance with the California Environmental Quality Act before the rights <br /> can be granted. . <br /> 7. The applicant must pay the District for: <br /> a. Design of fences or other structures <br /> b. Structural protective measures <br /> c. Corrosion control protective measures <br /> d. District engineering, plan review, and inspection of activities <br /> e. Environmental documentation <br /> f. Application, permit or license fees. <br />. d <br /> 8. The plan for the execution of the work must be approved by the District. <br /> 9. The type and weight of equipment working over the aqueduct must be approved by the <br /> District. The use of vibratory compaction equipment is prohibited on the aqueduct right-of- <br /> way. <br /> 10. A minimum of 48 hours notice must be given to the District before work commences. To <br /> contact the District by telephone; call: The Aqueduct Section Stockton Office at <br /> (209) 946-8000. <br /> 11. A preconstruction meeting is required prior to start of work. <br /> 12. No building or portions of buildings shall be constructed on the property. No other types of <br /> structures shall be constructed unless specific approval is given by the District. <br /> 13. No longitudinal encroachments such as drainage ditches; gas, phone, or electrical lines; <br /> pipelines, or roads will be permitted. All property line fences must be located completely <br /> outside the aqueduct property lines. <br />