Laserfiche WebLink
Supplement No. 1 to Pr% ure 718 r Page 4 <br /> 35. Each truckload of concrete to be placed on the aqueduct right-of-way may be sampled by <br /> the District. No water may be added to the mix after sampling. <br /> 36. Maximum allowable slump is three inches. All concrete exceeding three inches will be <br /> rejected and cannot be used on the aqueduct right-of-way. <br /> 37. No traffic will be allowed over protective slabs until 3000 PSI is reached. <br /> 38. All work areas shall be inspected by EBMUD for final approval. As-built drawing submittals <br /> are required for EBMUD approval. <br />