Laserfiche WebLink
Chandler Martin March 18, 1993 <br /> MS-94-9.SJC Page 2 <br /> 1 . District Rule 4901 - Residential Wood Burning regulates the sale, installation <br /> and transfer of wood burning devices, and establishes a public education and <br /> voluntary wood burning curtailment program intended to reduce emissions of <br /> carbon monoxide and PM10. <br /> 2. District Rule 4902 - Residential Water Heaters regulates the sale and installation <br /> of natural gas-fired water heaters to limit the emissions of oxides of nitrogen. <br /> 3. District Regulation VIII - Fugitive Dust Rules is a series of rules designed to <br /> reduce PM70 emissions generated by human activity, including but not limited <br /> to construction, road building, bulk materials storage and landfill operations. <br /> The SJVUAPCD suggests that the project applicant take all feasible measures to <br /> reduce the amount of dust (fine particulate matter-PM10) and ozone precursors <br /> (Reactive Organic Gases (ROG), and Oxides of Nitrogen (NO2, NO.) that will result <br /> from construction of this project. Specifically, the District suggests that the following <br /> Mitigation Measures be included as part of project approval: <br /> • All material excavated, graded or otherwise disturbed should be sufficiently <br /> watered to prevent excessive amounts of dust. Watering should occur at least <br /> twice daily with complete coverage, preferably in the late morning and after <br /> work is done for the day. <br /> • All clearing, grading, earth moving, or excavation activities should cease when <br /> wind speeds are equal to or greater than 20 mph. <br /> • On-site vehicle speed should be limited to 15 mph. <br /> Ozone Precursors-Ozone precursor emissions should be controlled by the following <br /> methods: <br /> • All internal combustion engine driven equipment should be properly maintained <br /> and tuned according to manufacturers specifications. <br /> • Idling of all internal combustion equipment shall be limited to ten minutes at any <br /> given time. <br /> • Use of building materials that do not require the use of paints/solvents. <br />