Laserfiche WebLink
CONDITIONS OF APPROVAL <br /> PA-0800205 <br /> Beckman <br /> Site Approval Application No. PA-0800205 was approved by the San Joaquin County Community <br /> Development Department on September 12, 2008. The effective date of approval is September 22, <br /> 2008. This approval will expire on March 24, 2010, which is 18 months from the effective date of <br /> approval, unless (1) all Conditions of Approval have been complied with, (2) all necessary building <br /> permits have been secured and remain in force, and (3) all necessary permits from other agencies <br /> have been secured and remain in force. <br /> Unless otherwise specified, all Conditions of Approval and Ordinance requirements shall be fulfilled <br /> prior to the establishment of the use and the issuance of any building permits. Those Conditions <br /> followed by a Section Number have been identified as Ordinance requirements pertinent to this <br /> application. Ordinance requirements cannot be modified, and other Ordinance requirements may <br /> apply. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT (Staff Contact: Patrick Crosby [209] 468-8597) <br /> a. BUILDING PERMIT: Submit an "APPLICATION-COMMERCIAL BUILDING PERMIT". The Site <br /> Plan required as a part of the building permit must be prepared by a registered civil engineer or <br /> licensed architect. This Plan must show drainage, driveway access details including gates, on- <br /> site parking, landscaping, signs, existing and proposed utility services, and grading (refer to the <br /> ."SiTE PLAN CHECK LIST" for details). A fee is required for the Site Plan review. (Development <br /> Title Section 9-884) <br /> b. APPROVED USE: This approval is for a fifteen (15) foot extension to an existing <br /> communications tower and replacement of communications support equipment, as shown on the <br /> Site Plan dated July 2, 2008. The new tower will have a maximum tower height of 156 feet (Use <br /> type: Communications Services, Type 11). <br /> c. CAPITAL FACILITY FEE: This project may be subject to the Capital Facility Fee. If the Capital I <br /> Facility Fee is applicable, the County shall collect the fees before the issuance of any building <br /> permits. (Development Title Section 9-1245.2) <br /> d. SETBACKS: New freestanding support structures shall be located a distance equal to at least <br /> the height of the said structure from residential structures on adjoining properties. (Development <br /> Title Section 9-1065.4[d]) <br /> e. MAINTENANCE OF FACILITIES: All freestanding structures, antennas, and supporting <br /> equipment associated with wireless telecommunication shall be maintained in good condition by <br /> the provider of the telecommunication facility and, whenever necessary, repaired or replaced. <br /> (Development Title Section 9-1065.7) <br /> f. REMOVAL OF FACILITIES: Freestanding structures, antennas, and supporting equipment <br /> associated with wireless telecommunication shall be removed by the provider of such facilities <br /> and the site restored to its pre-construction state if said facilities have not been operational or <br /> used for a period of six (6) consecutive months. Removal and site restoration shall be completed <br /> within ninety (90) days of the end of said six (6) month period. (Development Title Section 9- <br /> 1065.8) <br /> 1 <br /> 4 <br /> Conditions of Approval - 1 - PA-0800205 <br /> f <br />