Laserfiche WebLink
GOLF COURSE (CONTINUED) <br /> The irrigation system will be of a valve-in-head type and, <br /> due to the forgiving nature of the soil, will be wide-spaced. <br /> Satelite controllers will be of a digital type to provide for <br /> maximum water-savings control in the field. It is <br /> . anticipated that total heads required will be approximately <br /> 1, 500. Sprinkler manufacturer will be selected through bid <br /> process. <br /> As the course is shaped care will be taken to insure that all <br /> surface drainage stays within the golf course property. <br /> Drainfields placed under greens and tees will likewise be <br /> directed to swales designed to collect water. <br /> Cart paths will be constructed between greens and the <br /> following tees or where necessary for safety only. It is <br /> anticipated that approximately 65,000 square feet of cement <br /> paths will be used. <br /> It is anticipated that actual course construction will take <br /> approximately 14 months. Construction of the clubhouse and. <br /> other service buildings will take place during the 6-month 1 <br /> grow-in period. The facility should open for play no earlier <br /> than 18 months and no later than 24 months from start of <br /> course construction. <br /> CLUBHOUSE <br /> The clubhouse facility will be approximately 6,000 square <br /> feeti size. This will Drovide food and beverage service <br /> areas, golf shop, ms, - ce-an� In <br /> addition, there will be an out —ed-to <br /> accommodate tournament groups for meals. <br /> MAINTENANCE FACILITY <br /> The maintenance facility will consist of approximately <br /> 2,000 square feet of enclosed space with an additional 3,000 <br /> square feet of covered space for storage of equipment. An <br /> approved above-ground fuel station will be installed as <br /> well as cement-floored storage bins for sands and soil <br /> amendments. <br /> t �' <br />