Laserfiche WebLink
PA - 050 12 USE PERMIT' <br /> z:. SAN JOAQUIN COUNTY COMMUNITY DEVELOPMENT (DEPARTMENT <br /> H 1810 E. HAZELTON AVENUE,STOCKTON CA 95205 <br /> BUSINESS PHONE: (209)468-3121 <br /> tfFs a:P. Business Hours: 8:00 a.m. to 6.00 p.m. (Monday through Friday), <br /> -STEP 1 CHECK WITH STAFF - Development Services Staff will explain this requirembnts and..procedures to you: <br /> STEP 2 SUBMIT YOUR APPLICATION When you apply,file all the following: <br /> FEE The staff will let you know the current cost of filing an application. Make checks payable to the San Joaquin <br /> County Treasurer. <br /> • FORM Seven (7)copies of the completed application information forms(attached)which:a11 owners must sign. <br /> • SITE PLAN Seven(7)copies of-a folded Site Plan(see attached)and two(2)copies of a legible 8-112"x 11"site plan. <br /> • HAZARDOUS One copy of a completed Hazardous Materials Disclosure Survey forma copy of the-form is attached). <br /> MATERIALS <br /> • MEED One copy of the recorded deed(s)of the property. <br /> • SERVICES If your project requires connection to public facilities,you must submit a'will-serve"letter from the appropriate <br /> water,sewer and drainage entities at the time of filing. This letter must include a statement from the agency <br /> that they will serve the proposed development,and has,or will have,the capacity to provide such service. <br /> • APPLICATION Staff will check your application. If anything is missing,you will be notified in writing. The applicant will be <br /> COMPLETE sent a postcard once the application has been determined complete. (Your_application cannot be processed <br /> until it is com tete. <br /> STEP 3 APPLICATION PROCESSING <br /> • CEQA The County will decide if the proposal will have an adverse effect on the environment. If there are no adverse <br /> effects,the application will be processed. If there are potential adverse effects,further environmental review <br /> will be required. Projects that have the potential to adversely affect the environment will require the <br /> preparation of an E.I.R. This may extend the processing time. <br /> • REFERRALS Staff will refer the application to any County departments, other agencies and surrounding property owners <br /> AND ACTION affected by your proposal. At the end of a review and comment period a staff report will be prepared and the <br /> Planning Commission will hold a public hearing. If the Commission can make the required findings,the <br /> application will be approved: Typically action will be taken by the Commission within 8 weeks after <br /> application. <br /> • FINAL ACTION The action of the Commission can be appealed to the Board of Supervisors. The Commission's action is final <br /> unless appealed. For further information on the length of the appeal period,contact the staff. <br /> STEP 4 CONDITIONS AND ADDITIONAL PERMITS <br /> • CONDITIONS The staff will send you the final action and if it is approved, it will list conditions, by department,that must be <br /> met before you can start project. <br /> • IMPROVEMENT In addition to the Site Plan,an Imorovement Plan is frequently required as a condition of approval. This is an <br /> PLANS engineered plan showing drainage,grading,frontage improvements,access,on-and off-site service and utility <br /> facilities,landscaping and circulation/parking details. <br /> • DRIVEWAY Driveway Permits must be acquired from the Public Works Department for any work performed within the <br /> PERMITS road right of way. If the project fronts on a state highway these permits are obtained from Caltrans. <br /> • SANITATION& Projects that will utilize new on-site sanitation disposal and/or on-site wells,must get permits from the <br /> WELL PERMITS Environmental Health Division. <br /> • BUSINESS if the project involves a business,a Business License must be approved prior to starting operation. Business <br /> LICENSES License applications can be processed concurrently with the Use Permit application. <br /> • BUILDING If the project involves construction a building permit must be approved prior to commencement of work. <br /> PERMITS <br /> • OTHER Frequently other local,state and/or federal agencies will require permits prior to new uses being established <br /> PERMITS (e.g.Air Pollution Control District,Regional Water Quality Control Board or the Sheriffs Office). The <br /> Community Development Department will identify additional permits we are aware of that may be required for <br /> our project. <br /> FMEVSVOPlanning Application Forms\Use Permit.(Revised 1-2-03) Page 1 of 9 <br />