Laserfiche WebLink
4 i <br /> Kerry Sullivan -2` <br /> CONIlVIENTS ON DEVELOPMENTS <br /> PA-0200126 <br /> 3. The Traffic Impact Nfitigation Fee shall be required for this development. The fee is due <br /> and payable at the time of building permit application. (The fee currently is $779.00 per <br /> 1,000 gross square foot of building designated as Warehouse in the Lockeford area. The <br /> fee shall be automatically adjusted July 1 of each year by the Engineering Construction <br /> Cost Index as published by the Engineering News Record. A credit may be allowed if it <br /> can be verified that the existing development on this site was in operation on or after April <br /> 23, 1990.) <br /> (Resolutions 00-433) <br /> 4. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 5. Verification shall be obtained from the Solid Waste Division (468-3066) that this <br /> development has met the requirements of the Waste Plan Format for Development <br /> Projects. Final Site Plan is required upon submittal of verification. <br /> 6. On-site storm water retention may be allowed. However, the applicant shall pay into the <br /> Lockford Drainage Trust fund fee. Currently the fee is $6650.00 per acre of development. <br /> i <br /> GK:BN:sh <br /> i <br /> i <br />