Laserfiche WebLink
r1T -t�chn� f <br /> Schenone/Chocoholics Preliminary Septic System <br /> UA <br /> Greer mP Influent from floorlwash sinks <br /> 1200 � V ` Va oV <br /> 2 Comp.tnp, _�/t/ <br /> Ze Influent from restrooms <br /> � �� <br /> Primary Tank `� <br /> I 4(y a o Gal, �7 / ' <br /> � Comp. 5 V <br /> econ ary an <br /> 1200 Gal. STEP system with dual pumps and BioTube Pump Vault <br /> 2 Comp, <br /> Distribution <br /> Automatic Distribution Valve Box/Flow Director <br /> Observation Port <br /> a w <br /> e <br /> Infiltrator Chambers 1.0 inch I.D.Laterals with <br /> Clean-outs at distal ends a <br /> a � <br /> v <br /> �—la's t--12°—♦ �--10°—► <br /> Observation Port <br /> 5' 10` <br /> 10 Ft. 1-25 inch I.D.manifold 2-36"diameter,16 R Deep <br /> Seepage Pits <br /> 1800 Sq.Ft. <br /> Filter Bed Area <br /> CHAMBERS TANKS <br /> Infiltrator chamber specs: I - 1200 Grease Trap <br /> Standard Infiltrator Chamber SC:34"x 75"x 12" 1 -2000 Gallon Single Compartment <br /> 3 chambers on either side of center manifold I - 1200 Gallon Dual Compartment <br /> Chamber Spacers: 6' Biotube Pump Vault,dual pump system with alarm <br /> Scarify soil/effluent interface All tanks martholed per EHD requirements <br /> Two observation ports <br /> 1.0 inch I.D. lateral piping <br /> Clean-outs at distal ends per EHD requirements <br /> i <br /> SEE ATTACHED SPECIFICATION SHEETS <br /> FOR ADDITIONAL INFORMATION <br /> I � <br /> MEW— <br /> i <br /> I Ches�Co=dtiq <br /> i <br />