Laserfiche WebLink
"„e o t a s r" {/�,�\ Scnlinone Waste Water 01.21.05cw0i.24.xis=-Status Summary 21 Jan o5 <br /> Attachment A - <br /> DatelTlme <br /> Design Point Actua€Data Note' <br /> Data of 1st. C <br /> Operation - 15-Mar-04, <br /> Volume-Effluent, .For 9 Months Ending 20 Approx 3,000 used during <br /> Jan 05 ,632,000 Gallons 197,600 Gallons Startup and <br /> Commissioning <br /> Flowrate_Effluent For 9 Jan 05 Months Ending 20 2000 GPD 616 GPD 194,800 gallons/316 days m <br /> Application Ra#e-- For 9 m6oths Eng din 20 <br /> GallAcre•Day-' 1.71, Project 3.6 <br /> Overall Project Jan OS Acres <br /> Appllcation'Rate- For 9 Months Ending 20 <br /> GallAcre'Day- Jan 05 — 4,931 Dispersal Area=0.125 <br /> Dispersal Area fi Acres <br /> More Nitrogen Uptake <br /> Than LeechlinelPits <br /> Filter Bed Only Used Wanted To Ver' <br /> Manual Valve For9 Months Ending 20 Verify �. - <br /> Position Jan 05 - From March 15,2004 Operation'Of Filter Bed._ <br /> to Jan.18,2005 <br /> = System Has Handled <br /> Heavy Winter Rains <br /> Without Surfacing <br /> Sod Installed Approx. <br /> July 2004. Shallow, <br /> For 9 Months.Ending 20 Rooted Shrubs lasted <br /> Vegetative State g No apparent ponding of <br /> Jan 05 planted <br /> at Periphery of effluent water observed ' <br /> • <br /> Dis ersal Area <br /> Leachline Riser - <br /> Inspection-Water For 9 Months Ending 20 <br /> ' <br /> Level-'Dis'tance To Jan 12 In,05 — � - a � <br />- y <br /> Top Of Soil �. <br /> Leachilne Riser <br /> Inspection-Water For 9 Months Ending 20 <br /> Level-Distance.To Jan 05 4 in. _ <br /> Bottom Of Trench I <br /> Increased Efficiency of, J <br /> i <br /> '. New facility',has Reduced <br /> Headcount <br /> i <br /> Average Number Of For 9 Months Ending 20 <br /> Employees- P4 17 Retail Shop Has Not ' <br /> Monthly Jan 05 Added Planned Number ' Y <br /> of Employees <br /> Small Reduction in > � <br /> Overall Sales Volume <br /> Average Number Of For 9 Months Ending 20. 50 3 <br /> Visitors-Monthly Jan 05 ' <br /> Grease Trap Status 20-Jan-05 1"Thickness <br /> Primary Tank 20-Jan-05. _ 12",Scum Thickness <br /> 1"Sludge Thickness <br /> - Settling Tank 20-Jan-05 .; --.I 0"Scum Thickness r � <br /> 0^Sludge Thickness <br /> Spills Or Upsets For 9 Months Ending 20 _ None <br /> Jan 05 <br /> - E <br /> 22 High Level Alarms <br /> ' <br /> System Alarms For 9 Months Ending 20 _ r � 1 <br /> y Jan 05 None Recorded During Startup <br /> - and Commissioning <br /> System Cycles- For 9 Months Ending 20 Includes Startup and r <br /> Pum #1' Jan 05 - 3,009 <br /> Commissioning <br /> System Cycles- For 9 Months Ending 20 Includes Startup snit <br /> Pum #2 Jan 05 — 1,505 - Commissioning <br /> System Minutes- For 9 Months Ending 20 Includes Startup and <br /> Pum #1 Jan 05 —. 3'005 Commissioning <br /> System Minutes- For 9 Months Ending.20 Includes Startup and <br /> Pum #2 Jan 05 1,506 <br /> Commissioning <br /> Dosage-Gallons For 9 Months Ending 20 32 Includes Startup and , <br /> Per Cycle Jan o5 Commissioning <br /> Notes.Of System• 21)-Jan-05 Bio Tube tnspected and Little To No Fouling <br /> Maintenance • Cleaned Observed <br /> S C H E N O N E_ S P E'C I A L T Y F-O O,D S', I N C . <br /> - r , <br /> 18819 East Hwy 88 P.O. Box 730 Clements, California 95227 i Phone: (209) 759=3340 Fax: <br /> Etnat {209) 759-3350 <br /> t1H4l2Ato0 <br /> • o@go urmetchocolate.com;• www.gourmetchncolate'.coni` - � - � � <br />