My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004324
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
18819
>
2600 - Land Use Program
>
PA-0200428
>
SU0004324
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:24:09 AM
Creation date
9/4/2019 6:21:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004324
PE
2632
FACILITY_NAME
PA-0200428
STREET_NUMBER
18819
Direction
E
STREET_NAME
STATE ROUTE 88
City
CLEMENTS
APN
01924018
ENTERED_DATE
5/17/2004 12:00:00 AM
SITE_LOCATION
18819 E HWY 88
RECEIVED_DATE
10/4/2002 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\E\HWY 88\18819\PA-0200428\SU0004324\CDD OK.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
489
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INFORMATION SHEET <br /> ORDER NO. <br /> ERNIE AND MARY SCHENONE <br /> SCHENONE SPECIALTY FOODS, INC. <br /> SAN JOAQUIN COUNTY <br /> a <br /> Ernie and Mary Schenone (Discharger) doing business as Schenone Specialty Foods, will operate <br /> k Chocoholics Divine Desserts (CDD) at 18819 East Highway 88, Clements. The facility will consist of a <br /> renovated existing 3,600 sq. ft. building and a new 14,200 sq. ft. building. CDD plans to manufacture and <br /> distribute wholesale gourmet chocolate products with onsite sales of chocolate products to the general <br />+ public. Primary products include chocolate candy and sauces, but the facility will also serve hot chocolate <br /> and coffee drinks that include the sauces. Products for retail sale may also include ice cream. The <br /> discharger anticipates between 29 and 104 customers per day. <br /> f <br /> Wastewater flow rates will vary during the year with the highest flow anticipated in October. The RWD <br /> demonstrated hydraulic capacity for the highest flow including the I00-year annual total rainfall. <br /> The proposed wastewater treatment and disposal system consists of(a) a 1,200 gallon, two-compartment, <br /> grease trap that will receive industrial waste from the manufacturing floor drains, wash sinks, cooling <br /> tables, and washing machine; (b) a 2,000 gallon, single-compartment, septic tank that will receive <br /> domestic waste from the 14,200 sq. ft. building and the existing 1,600 sq. ft. building, and (c) a secondary <br /> 2,000 gallon, two-compartment, settling tank containing a septic tank effluent pump. The settling tank <br /> will receive the waste from both the industrial grease trap and the domestic septic tank. Wastewater will <br /> be pumped from the secondary settling tank to one of two disposal systems: an 1,800 sq. ft. filter bed area <br /> equipped with 22 Iaterals protected by Infiltrator chambers, or two 40 ft. long leachlines with 16 ft. deep <br /> seepage pits at the terminal ends. The Discharger proposes to direct wastewater flow between the two <br /> systems by a manual valve; however, an automatic distribution valve is required to prevent pressure <br /> dosing the seepage pits and therefore discharging excess wastewater to the seepage. The dispersal area <br /> will be landscaped to allow shallow rooted plants to take up nitrogen. <br /> Based on the information available, the mixture of industrial and domestic wastewater will be generally <br /> similar to normal domestic wastewaterexcept biochemical oxygen demand is 2.75 times the <br /> concentration of typical domestic wastewater. That ratio may increase with increased industrial <br /> wastewater generation. The Discharger has not characterized the expected salt concentration of the <br /> wastewater. <br /> Effluent limits were developed for the discharge based on the source water quality, the Report of Waste <br /> Discharge, and published information on the reduction of BOD and total nitrogen in septic tank effluent. <br /> The TDS limit is based on the source water quality with 350 mg/L added. The BOD and total nitrogen <br /> limits were based on the RWD anticipated values and anticipated reduction factors. The reduction factors <br /> were based on the California Wastewater Training & Research Center's septic tank influent and effluent <br /> values. <br /> The design flow for the wastewater treatment equipment is approximately 2,000 gallons per day. <br /> The topography of the site is relatively flat at an elevation of approximately 125 feet above mean sea <br /> level. On-site soils consist of loam to sandy clay loam with moderatly rapid permeability. Groundwater <br /> is believed to exist at a depth of 140 feet below ground surface. Groundwater flow direction is to the <br /> southwest but may vary based on operating groundwater extraction wells. The Clements munical water <br /> supply is located approximately 1,000 feet southwest (downgradient) of the CDD facility. <br /> Surface water drainage from the surrounding area is to the Mokelumne River. <br /> TRO: 1/8/2004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.