My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004324
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
18819
>
2600 - Land Use Program
>
PA-0200428
>
SU0004324
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:24:09 AM
Creation date
9/4/2019 6:21:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004324
PE
2632
FACILITY_NAME
PA-0200428
STREET_NUMBER
18819
Direction
E
STREET_NAME
STATE ROUTE 88
City
CLEMENTS
APN
01924018
ENTERED_DATE
5/17/2004 12:00:00 AM
SITE_LOCATION
18819 E HWY 88
RECEIVED_DATE
10/4/2002 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\E\HWY 88\18819\PA-0200428\SU0004324\CDD OK.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
489
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT C - 2,- <br /> Monitoring Well Installation Workplan <br /> Monitoring Well Installation Report <br /> D. Well Development: <br /> Require a minimum of 48 hours prior to development activities <br /> Method of development to be used <br /> Method of determining when development is complete <br /> z <br /> Parameters to be monitored during development <br /> Method of development water storage and disposal <br /> _E. Well Survey: <br /> Identify the Licensed Land Surveyor or Civil Engineer that will perform the survey <br /> Describe what well features will be surveyed (i.e. top of casing, horizontal and vertical <br /> coordinates, etc.) <br /> Vertical accuracy shall be to at least 0.01 foot . <br /> F. Soil Sampling (if applicable): <br /> Analyses to be run and methods <br /> Sample containers, collection method, and preservation method <br /> Table describing sample volumes, sample containers, preservation agents, and hold times <br /> Intervals at which soil samples are to be collected <br /> Number of soil samples to be analyzed and rationale <br /> Location of soil samples and rationale <br /> QA/QC procedures <br /> G. Well Sampling: <br /> Minimum time after development before sampling (48 hours) <br /> Well purging method and amount of purge water <br /> Sample containers, collection method, and preservation method <br /> Table describing sample volumes, sample containers, preservation agents, and hold times <br /> QA/QC procedures <br /> H. Water Level Measurement: I! <br /> The elevation reference point at each monitoring well shall be within 0.01 foot. Ground <br /> surface elevation at each monitoring well shall be within 0.01 foot. Method and time of water <br /> level measurement shall be specified. <br /> 1. Proposed time schedule for work. <br /> SECTION 2 — Groundwater Sampling and Analysis Plan <br /> A. General Information: <br /> Purpose of well sampling <br /> Site Location <br /> Monitoring well locations q <br /> Monitoring well construction details including elevation, well depth, casing material and size, <br /> and screen interval <br /> Equipment decontamination procedures <br /> li <br /> 'i <br />
The URL can be used to link to this page
Your browser does not support the video tag.