Laserfiche WebLink
cp� TELEFAX Inc. <br /> Schenone Specialty Foods, DEC 15 2003 <br /> .."t Drug,* 3765 N.Wilcox Road Suite H <br /> Q,iStockton, CA 95215 <br /> Phn: (209) 931-5188 Fax: (209) 931-M 'ERVICES <br /> Email:Wemakechoc@aol.com <br /> Website'.gourmetchocolate.corn <br /> Construction Numbers <br /> Site Phn: 209.759.3340 Cell Ernie -#1209.598.8248 <br /> Site Fax: 209.759.3350 Cell Ernie - #2 209.483.2590 <br /> Cell Jay - 209.402.9584 <br /> To: Mr.Al Olsen FAX: (209) 464 0138" <br /> San Joaquin County <br /> Environmental Health Department Page, I of 5 <br /> Date- '14 December 03 <br /> Re: Clements—PA-0200428 (SA) <br /> From: Emie Schenone, Jr. <br /> Dear Al; <br /> Per your request, attached is the drawing submitted December 11th with the additional <br /> information you requested. <br /> 0 1 have added the distances and dimensions of our concrete paths/steps relative <br /> to the buildings <br /> 0 1 added/redrew the leach lines, and leach pits for clarity. <br /> I added property lines and Caltrans easement lines <br /> • I showed the distribution valve and distribution box <br /> I showed piping from tanks and InfitVator distribution manifold <br /> • I added overall dimensions of area available for septic disposal (unpaved area) <br /> I also attached a`frequently Asked Questions"from Infiltrators website that points out <br /> that the chambers can be installed around obstacles. I took this as a further support <br /> that it is minor issue to change the filter bed shape from square to a rectangle- I am, <br /> hoping that SJ County EHD also views this as a minor and acceptable change. I am <br /> significantly over budget and past deadline. The original designer Don Chesney has <br /> completed his scope and is unavailable to me for further consultation or review. I am <br /> hoping on avoiding further engineering and design expense as well as be able to <br /> proceed with installation of the,concrete and leach field as winter weather permlits. <br /> I appreciate the extra time that you are spending to review my request to deviate from <br /> the previously approved plan. When the original septic design was done our <br /> landscape/pathftnoe plans were preliminary and the septic system was designed <br /> time was <br /> based on total square footage allocated for septic. Our main concern at the tiimi <br /> 09613 '65L'602 • 'BUDUO43S aluJ3 j00 :20 Co sl oaa <br />