Laserfiche WebLink
TACHMENT 2 <br /> California Regional Water (duality Co--n--nfrol Boardoaw .Central Valley Region <br /> Robert Schneider,Chair <br /> Winston H.Hicltot Grav Davis <br /> Secretary for Sacramento Main Office Gnrernw <br /> Envirorrraental Internet Address: h1tpJ/wwwswrcbca.gov/—r�vqcb5 <br /> Protection. 3443 Routier Road,Suite A,Sacramento,California 95827-3003 <br /> Phone(916)255-3000-FAX(916)255-3015 <br /> 21 October 2002 <br /> Jose Rubianes Frank Giannecchini <br /> San Joaquin County Comm. Develop. Dept. P.O.Box 10 <br /> 1810 E. Hazelton Ave. 'Linden,CA 95236— <br /> Stock-ton, <br /> 5236Stockton, CA 95205 <br /> Ernie Schenone Jr... <br /> 3765 N. Wilcox #H <br /> Stockton, CA 95215 - <br /> PA-0200428(SA), SITE APPRO VAL FOR CHOOLA TE MANUFACTURING AND <br /> DISTRIBUTIONFACA CLEMENTS, SAN JOAQUIN COUNTY <br /> I have reviewed the Application Referral for the chocolate manufacturing and distribution facility in <br /> Clements, San Joaquin County distributed by the San Joaquin County C6m'M; unity Development <br /> Department. The Application'Number is PA-0200428(SA). ,The document briefly describes plans to <br /> remodel an existing 3,600 square foot building and add 12,600 square feet-of manufacturing and <br /> warehouse building space. The Application Referral doesn't describe any wastewater generation or <br /> disposal plans with the exception of a septic tank and leach field areas. <br /> Food manufacturing generates high strength wastewater that is not suitable_ for discharge to a septic tank <br /> E system. Because wastewater will be generated from an industrial process, Waste Discharge <br /> Requirements (WDRs) will be required for the discharge of wastewater at the site.;The property owner <br /> and/or facility operator shall submit a Report of Waste Discharge.(RWD) at least 120-days prior to <br /> discharging wastewater at the site. California Water Code Section 13260 requires submittal of the-RWD. <br /> Construction Stormwater Permit <br /> A NPDES General Permit for Storm Water Discharges Associated with Construction Activities, Order <br /> No. 99-28-DWQ,is required when a project involves clearing,grading, disturbances to the ground, such <br /> as stockpiling,or excavation. Currently, construction activity that involves soil disturbances on <br /> construction sites five acres or greater or which are part of a larger common plan of development or sale <br /> require a construction storm water permit. <br /> Dewatering Permit <br /> The proponent may be required to file a Dewatering Permit covered tinder Waste.Discharge <br /> e Requirements General Order for Dewatering and Other Low Threat Discharges to Surface Waters <br /> Permit, Order No. 5-00-.175 (NPDES CAG995001). The following discharges may be covered by this <br /> California Environmental Protection Agency <br /> QJ Recycled Paper <br /> The energy challenge facing California is real. Every Californian needs to take immediate action to reduce energy consumption. <br />