Laserfiche WebLink
CALIFORNIA WATER SERVICE <br /> Stockton District 1642 E Lafayette St,Stockton,CA 95205 <br /> Tek(209) 464-8311 <br /> March 1,2017 <br /> Mr_Anthony Lopes <br /> 5 iegfried <br /> 3244 Brookside Road,Suite 100 <br /> Stockton,CA 95219 <br /> (emailed to Tony Lopes @ tlopesCasiegfriedcng.com) <br /> Will Serve Letter <br /> Tract or Parcel Map No: 38551E Farmington Road <br /> Dear Mr. lopes: <br /> California Water Service Company Stockton District("Cal Water")has determined that water is available to <br /> serve the above-referenced prpject based on the information provided. Cal Water agrees to operate the water <br /> system and provide service in accordance with the rules and regulations of the California Public Utilities <br /> Commission(CPUC)and the company's approved tariffs on file with the CPUC. This determination of water <br /> availability shall remain valid for two years from the date of this letter. if construction of the project has not <br /> commenced within this two yeartime frame,Cal Waterwill be underno further obligation to serve the project <br /> unless the developer receives an updated letter from Cal Water reconfirming water availability. Additionally, <br /> Cal Water reserves the right to rescind this letter at any time in the event its water supply is severely reduced <br /> by legislative,regulatory or environmental actions. <br /> Cal Water will provide such potable water at such pressure as may be available from time to time as a result <br /> of its normal operations per the company's tariffs on fele with the CPUC. Installation of facilities through <br /> developer funding shall be made in accordance with the current rules and regulations ofthe CPUC including, <br /> among others,Tariff Rules 15 and 16 and General Order 103-A. In order for us to provide adequate water for <br /> domestic use as well as fire service protection,it may be necessary for the developer to fund the cost of special <br /> facilities, such as, but not limited to, booster pumps, storage tanks and/or water wells,in addition to the cost <br /> of mains and services. Cal Water will provide more specific information regarding special facilities and fees <br /> after you provide us with your improvement plans,Fire department requirements,and engineering fees for this <br /> project. <br /> This letter shall at all times be subject to such changes or modifications by the CPUC as said Commission <br /> may,from time to time,require in the exercise of its jurisdiction. <br /> 1f you have any questions regarding the above,please cull me at(209)464-8311. <br /> Sinee.rely, <br /> ret Daliken <br /> Construction Superintendent—Stockton District <br /> cc: Ting fie—Cal Water Engineering Dept <br /> File <br /> Quality.Service. Valve. <br /> calwater.carr► 0 C <br />