Laserfiche WebLink
S J C O G, Inc. <br /> 555 East Weber Avenue • Stockton,CA 95202 • (209)235-0600 • FAX(209)235-0436 <br /> San Joaquin County Multi-Species Habitat Conservation Pr Open Space Plan (SJMSCP) <br /> SJMSCP RESPONSE TO LOCAL JURISDICTION(RTLJ) <br /> ADVISORY AGENCY NOTICE TO SJCOG,Inc. <br /> To: Alisa Goulart,San Joaquin County,Community Development Department <br /> From: Laurel Boyd, SJCOG, Inc. <br /> Date: December 19,2018 <br /> Local Jurisdiction Project Title: PA-1800309(MS) <br /> Assessor Parcel Number(s): 103-020-01, -09,-19 <br /> Local Jurisdiction Project Number: PA-1800309(MS) <br /> Total Acres to be converted from Open Space Use: Unknown <br /> Habitat Types to be Disturbed: Agricultural Habitat Land <br /> Species Impact Findings: Findings to be determined by SJMSCP biologist. <br /> Dear Ms. Goulart: <br /> SJCOG, Inc. has reviewed the application referral for PA-1800309 (MS). This project consists of a Minor Subdivision <br /> application to subdivide three (3) existing parcels into eight (8) parcels, each to contain a minimum of 40 acres. The <br /> applicants applied for a parcel map waiver. The project site is on the south side of State Route 26, and the west side of <br /> Beecher Road, Stockton (APN/Address: 103-020-01, -09, -19/9318 East Finkbohner Road, Stockton). <br /> San Joaquin County is a signatory to San Joaquin County Multi-Species Habitat Conservation and Open Space Plan <br /> (SJMSCP). Participation in the SJMSCP satisfies requirements of both the state and federal endangered species acts, <br /> and ensures that the impacts are mitigated below a level of significance in compliance with the California Environmental <br /> Quality Act (CEQA). The LOCAL JURISDICTION retains responsibility for ensuring that the appropriate Incidental Take <br /> Minimization Measure are properly implemented and monitored and that appropriate fees are paid in compliance with the <br /> SJMSCP. Although participation in the SJMSCP is voluntary, Local Jurisdiction/Lead Agencies should be aware that if <br /> project applicants choose against participating in the SJMSCP, they will be required to provide alternative mitigation in an <br /> amount and kind equal to that provided in the SJMSCP. <br /> At this time, the applicant is requesting a Minor Subdivision with no ground disturbance. Any future <br /> structures that require ground disturbance on this or subsequent divided parcels will be subject to <br /> participate in the SJMSCP and should be resubmitted to this agency. Current or future owners of this- <br /> or subdivided properties should be made aware of the conditions that are placed by the SJMSCP on <br /> future development on the created parcels. <br /> This Project is subject to the SJMSCP. This can be up to a 90 day process and it is recommended that the project <br /> applicant contact SJMSCP staff as early as possible. It is also recommended that the project applicant obtain an <br /> information package. httoi//www.sicoQ.orci <br /> Please contact SJMSCP staff regarding completing the following steps to satisfy SJMSCP requirements: <br /> • Schedule a SJMSCP Biologist to perform a pre-construction survey prior to any ground disturbance <br /> • SJMSCP Incidental take Minimization Measures and mitigation requirement: <br /> 1. Incidental Take Mmunivation Measures UTMMs)will be issued to the project and must be signed by the project applicant prior to any <br /> ground disturbance but no later than six(6)months from receipt of the ITMMs. If ITMMs are not signed within six months,the applicant <br /> must reapply for SJMSCP Coverage. Upon receipt of signed ITMMs from project applicant,SJCOG,Inc.staff will sign the ITMMs. This <br /> is the effective date of the ITMMs. <br /> 2. Under no circumstance shall ground disturbance occur without compliance and satisfaction of the ITMMs. <br /> 3. Upon issuance of fully executed ITMMs and prior to any ground disturbance,the project applicant must <br /> a. Post a bond for payment of the applicable SJMSCP fee covering the entirety of the project acreage being covered(the bond <br /> should be valid for no longer than a 6 month period),or <br /> b. Pay the appropriate SJMSCP fee for the entirety of the project acreage being covered;or <br />