Laserfiche WebLink
(2) Provide restrooms conforming with all disabled access requirements (C.C.R., Title 24). <br /> (3) The Construction Site Plan shall indicate the following: <br /> A. Provide parking for the physically disabled. The space(s) shall be located as close as <br /> possible to the primary entrance(C.C.R., Title 24). <br /> B. Provide identification signs for the parking space(s) including the 'tow away" sign at each <br /> entrance or visible from each space(C.C.R., Title 24). <br /> C. The slope of a parking space shall not exceed 1/4 inch per foot(C.C.R.,Title 24). <br /> D. Provide one van parking space. <br /> 2. DEPARTMENT OF PUBLIC WORKS (Staff Contact: Bill DuBois, 468-3000) <br /> a. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and <br /> payable at the time of building permit application. The fee currently is $166.00 per daily trip-end <br /> generated in the Stockton area. The fee shall be automatically adjusted July 1 of each year by <br /> the Engineering Construction Cost Index as published by the Engineering News Record. <br /> (Resolution R-00-433) <br /> b. The Regional Transportation Impact Fee shall be required for this development. The fee is due <br /> and payable at the time of building permit application. The fee currently is$1,430.00 per 1,000 <br /> equivalent gross square feet of building. The fee is based on the current schedule. (Resolution <br /> R-06-38) <br /> c. A copy of the final site plan shall be submitted prior to the release of building permits. <br /> d. The project shall be served by a public sewer collection and treatment system constructed in <br /> conformance with the requirements of Environmental Health and Public Works. Service shall be <br /> provided by the Pacific Gardens Sewer District. (Development Title Section 9-1105.2) <br /> e. A terminal drainage system shall be provided to meet the requirements of San Joaquin County <br /> Development Standards and to provide adequate drainage for the site. Service shall be provided <br /> by CSA 54. (Development Title Section 9-1135.3) <br /> f. The site is located in an area that could potentially be within a flood hazard area when the new <br /> FEMA FIRM maps are adopted in 2009. If the maps indicate that the site is located within a <br /> special flood hazard area, and construction commences after the date of the map adoption, the <br /> construction shall meet all Federal, State, and County requirements for construction within a 100- <br /> year flood plain. <br /> g. Dischargers whose projects disturb one or more acres of soil or whose projects disturb less than <br /> one acre but are part of a larger common plan of development that in total disturbs one or more <br /> acres are required to obtain coverage under the General Permit for Discharges of Storm Water <br /> Associated With Construction Activity (Construction General Permit 99-08-DWO). Construction <br /> activity subject to this permit includes clearing, grading, and disturbances to the ground such as <br /> stockpiling or excavation but does not include regular maintenance activities performed to restore <br /> the originals line, grade, or capacity of the facility. <br /> Conditions of Approval - 3- PA-0800214 <br />