Laserfiche WebLink
qp <br /> THOMAS R. FLINN P.O.BOX 1810-1910 E.HAZELTON AVENUE <br /> DIRECTOR STOCKTON,CALIFORNIA 95201 <br /> (209)468-3000 FAX(209)468-2999 <br /> w .sjgov.org/pubworks <br /> THOMAS M.GAL ' <br /> CHIEF DEPUTY DIRECTOR �yyam.......... <br /> MANUEL SOLORIO World b for YOU <br /> DEPUTY DIRECTOR <br /> STEVEN WINKLER <br /> DEPUTY DIRECTOR <br /> ROGERJANES <br /> BUSINESS ADMINISTRATOR <br /> RECEIVE[) <br /> August 5,2008 AUG 7 2008 <br /> MEMORANDUM 1Q'om I unni y Development Dept. <br /> TO: Rick Griffin, Senior Planner <br /> Community Development Department <br /> CONTACT PERSON: Jason Jones <br /> FROM: Bill DuBois,Engineer III <br /> Public Services Division <br /> SUBJECT: PA-08-00214 A USE PERMIT APPLICATION TO EXPAND AN EXISTING GROUP CARE <br /> FACILITY FROM 12 RESIDENTS TO A MAXIMUM OF 21 RESIDENTS, LOCATED ON THE <br /> SOUTHEAST SIDE OF MENDOCINO AVENUE AND FRANKLIN AVENUE, IN STOCKTON. <br /> (SUPERVISORIAL DISTRICT 1) <br /> PROPERTY OWNER: Hagios Investments,LLC etal APPLICANT: Michael Meredith <br /> ADDRESS: 3029 N.Franklin Avenue, Stockton ATN: 111-100-19 <br /> INFORMATION: <br /> The site is not currently located within a Federal Flood Insurance Administration Designated Flood Hazard Area. <br /> Franklin Avenue has an existing right-of-way width of 50-feet and a planned right-of-way width of 50-feet. <br /> Mendocino Street has an existing right-of-way width of 60-feet and a planned right-of-way width of 60-feet. <br /> RECOMMENDATIONS: <br /> 1. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable at the <br /> time of building permit application. (The fee currently is$166.00 per daily trip-end generated in the <br /> Stockton area). The fee shall be automatically adjusted July 1 of each year by the Engineering Construction <br /> Cost Index as published by the Engineering News Record. (Resolutions R-00-433) <br /> 2. The Regional Transportation Impact Fee shall be required for this development. The fee is due and <br /> payable at the time of building permit application. The fee currently is $1,430.00 per 1,000 equivalent gross <br /> square foot of building. The fee is based on the current schedule. (Resolution R-06-38) <br /> 3. A copy of the final site plan shall be submitted prior to release of building permit. <br />