My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0011507
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRAZIER
>
17508
>
2600 - Land Use Program
>
PA-1700190
>
SU0011507
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:35:12 AM
Creation date
9/4/2019 6:38:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0011507
PE
2622
FACILITY_NAME
PA-1700190
STREET_NUMBER
17508
Direction
E
STREET_NAME
FRAZIER
STREET_TYPE
RD
City
LINDEN
Zip
95236-
APN
06510008
ENTERED_DATE
9/26/2017 12:00:00 AM
SITE_LOCATION
17508 E FRAZIER RD
RECEIVED_DATE
9/25/2017 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\F\FRAZIER\17508\PA-1700190\SU0011507\APPL.PDF \MIGRATIONS\F\FRAZIER\17508\PA-1700190\SU0011507\CDD OK.PDF \MIGRATIONS\F\FRAZIER\17508\PA-1700190\SU0011507\EH COND.PDF \MIGRATIONS\F\FRAZIER\17508\PA-1700190\SU0011507\MISC.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
31SJCOG, Inc . <br /> S JC0G,Inc. <br /> San Joaquin County Multi-Specier Habitat Conserpation ey Open Space Plan <br /> 555 East Weber Avenue • Stockton,CA 95202• (209) 235-0600• FAX(209)235-0438 <br /> SJMSCP HOLD <br /> Lt <br /> TO: Local Jurisdiction: Community Development Department Planning Department Building Department, Engineering Department Survey Department Transportation Department <br /> Other. <br /> FROM: Laurel Boyd, SJCOG, Inc. <br /> DO NOT AUTHORIZE SITE DISTURBANCE <br /> DO NOT ISSUE A BUILDING PERMIT <br /> DO NOT ISSUE _ FOR THIS PROJECT <br /> The landowner/developer for this site has requested coverage pursuant to the San Joaquin County Multi- <br /> Species Habitat Conservation and Open Space Plan (SJMSCP). In accordance with that agreement, the <br /> Applicant has agreed to: <br /> 1) SJMSCP Incidental Take Minimization Measures and mitigation requirement: <br /> 1. Incidental Take Minimization Measures(ITMMs)will be issued to the project and must be signed by the <br /> project applicant prior to any ground disturbance but no later than six(6)months from receipt of the ITMMs. <br /> If ITMMs are not signed within six months,the applicant must reapply for SJMSCP Coverage. Upon receipt <br /> of signed ITMMs from project applicant,SJCOG,Inc.staff will sign the ITMMs. This is the effective date <br /> of the ITMMs. <br /> 2. Under no circumstance shall ground disturbance occur without compliance and satisfaction of the ITMMs. <br /> 3. Upon issuance of fully executed ITMMs and prior to any ground disturbance,the project applicant must: <br /> a. Post a bond for payment of the applicable SJMSCP fee covering the entirety of the project acreage <br /> being covered(the bond should be valid for no longer than a 6 month period);or <br /> b. Pay the appropriate SJMSCP fee for the entirety of the project acreage being covered;or <br /> c. Dedicate land in-lieu of fees,either as conservation easements or fee title;or <br /> d. Purchase approved mitigation bank credits. <br /> 4. Within 6 months from the effective date of the ITMMs or issuance of a building permit,whichever occurs <br /> fast,the project applicant must: <br /> a. Pay the appropriate SJMSCP for the entirety of the project acreage being covered;or <br /> b. Dedicate land in4ieu of fees,either as conservation easements or fee title;or <br /> c. Purchase approved mitigation bank credits. <br /> ..„ Failure to satisfy the obligations of the mitigation fee shall subject the bond to be called. <br /> Project Title: PA-1700190 (MS) <br /> Landowner: L6 Lagorio Land Company Applicant: Dillon & Murphy <br /> i cat Assessor Parcel#s;065-100-08.-37.-38 <br /> 1 JW <br /> T , R , Section(s): <br /> Local Jurisdiction Contact:Alisa Goulart <br /> The LOCAL JURISDICTION retains responsibility for ensuring that the appropriate <br /> Incidental Take Minimization Measures are properly implemented and monitored and that <br /> appropriate fees are paid in compliance with the SJMSCP. <br />
The URL can be used to link to this page
Your browser does not support the video tag.