Laserfiche WebLink
Kerry Sullivan -2- <br /> COMMENTS ON DEVELOPMENTS <br /> UP-00-10 <br /> 4. The Traffic Impact Mitigation Fee will be required for this development. The fee is due <br /> and payable at the time of building permit application. (The fee currently is $151.36 per <br /> additional daily trip-end generated in the Ripon area. The fee shall be automatically <br /> adjusted July 1 of each year by the Engineering Construction Cost Index as published <br /> by the Engineering News Record). <br /> (Resolutions R-90-304, R-91-1025, R-93-167, R-94-179, R-95-650 and R-96-592) <br /> 5. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 6. Verification shall be obtained from the Solid Waste Division (468-3066) that this <br /> development has addressed the items on the attached Waste Plan Format for <br /> Development Projects. Final Site Plan is required upon submittal of verification. <br /> GK:BN:mr <br /> PS-0E151 M <br /> E: Manuel Lopez, Director of Public Works <br />