Laserfiche WebLink
� "`� APPLICATION - COMMERCIAL BUILDING PERMIT <br /> P: I <br /> SAN JOAQUIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT <br /> 1810 E. HAZELTON AVENUE, STOCKTON CA 95205 <br /> .."�2;Fo,�.�° BUSINESS PHONE: (209) 468-3121 <br /> INSPECTION REQUEST-24 HOUR RECORDER: (209) 468-3165 <br /> PERMIT NO. <br /> THIS PORTION OF THE APPLICATION MUST BE COMPLETELY FILLED OUT BY THE APPLICANT <br /> IN ORDER TO APPLY FOR PERMITS REQUIRED TO BUILD A COMMERCIAL STRUCTURE. <br /> Scope of Work: <br /> Site Address: <br /> OWNER NAME AND ADDRESS APPLICANT NAME AND ADDRESS <br /> Name:Name: c �/L-_ CU C L Lv ) r r- <br /> — <br /> Address: x33-7 S .0 - 4 c.lx K Address: ��,73 SS Frees <br /> City: State: ft City: lf� c . State: C_/} <br /> ZIP: ZIP: S 5 Ph:( ) S`!e 7/ / <br /> CONTRACTOR INFORMATION Ph:( ) <br /> Lic.No: Company Name: <br /> Address: City: St: ZIP: <br /> DESIGNER INFORMATION Ph:( ) <br /> Lic. No: Company Name: <br /> Address: City: St: ZIP: <br /> BUSINESS INFORMATION Business Owner: <br /> Business Name(DBA): Mailing Address: <br /> CHECKLIST <br /> THE FOLLOWING INFORMATION AND DOCUMENTATION MUST BE SUBMITTED TO DEVELOPMENT Check <br /> SERVICES BEFORE YOUR APPLICATION CAN BE PROCESSED. -off <br /> 1. One completed application for a Commercial Building Permit. <br /> 2. Three complete sets of construction drawings prepared by an architect or engineer. (NOTE: All sheets of the working <br /> drawings must be stamped and wet signed prior to issuance of permit.) The plans must include: <br /> • Site plan. (NOTE: See the Site Plan Check List regarding requirements for the Site Plan.) <br /> • Structural plans. <br /> • A complete floor plan, including room usage, exiting plan and complete dimensions. (NOTE: For remodels and <br /> additions,the existing and proposed floor plans must be shown in their entirety.) <br /> • Plumbing and mechanical plans, including ventilation. <br /> • Electrical plans, including a complete one-line diagram of the service and feeders. <br /> • Disabled Access compliance. <br /> 3. Two sets of structural calculations, stamped and signed with a wet signature. <br /> 4. Two sets of complete constructionspecifications. <br /> 5. If prefabricated trusses are included in the scope of work, two sets of the following are required: <br /> • Complete truss layout designating each type of truss to be used. <br /> • Engineered truss plans and calculations which are cross-referenced to the truss layout plan. <br /> • Lateral bracing plans. <br /> • Details of any special features such as girder trusses, hangers between interconnected trusses,connections <br /> between trusses and beams,etc. <br /> • A letter signed by the responsible engineer or architect, stating that he/she has reviewed and approved the truss <br /> calculations and drawings,or either a shop approval stamp and signature or the responsible engineer's or architects <br /> stamp and signature. <br /> 6. Two sets of non-residential energy calculations with all required forms imprinted on the drawings. <br /> 7. One extra copy of the floor plan. Section 72 of the Revenue and Taxation Code now requires a copy of a complete floor <br /> Ian of the proposed work to be given to the County Assessor. <br /> 8. One extra site plan to be given to the Department of Public Works at the time of Building Permit application. <br /> 9. One copy of a completed Hazardous Materials Disclosure Survey form is required if the building permit application does <br /> not require discretions approval (e.g., Use Permit or Site Approval). Surve form is attached. <br /> 10. Permit Deposit <br /> F.BUIWINGW N�ERMITAPPPage 1 of 5 <br />