Laserfiche WebLink
M. There shall be no renting <br /> separate business from out or leasing of an <br /> y of the the owner/applicants'business unless 9heor o�u <br /> n The number of a owner ancy <br /> of the premises to a <br /> swing, employees shall be limited to twenty-five Y owns the business. <br /> and graveyard shifts as set forth on the attach five (25) and divided <br /> GICO Management to the San Joaquin Con the between the <br /> ed Exhibit "A^ from the correspondence from <br /> Community Development Department dated July 31, 2000. <br /> n.,,. .,..a�� <br /> the RX6tR9 buildings,--plant <br /> Kui6 <br /> 2. DEPARTMENT OF PUBLIC WORKS (Staff Contact: Gabriel Karam, 468-3000) <br /> a. An encroachment permit shall be required for work within the road right-of-way. (Development Title <br /> Sections 9-1145.4 and 9-1145.5) <br /> b. The driveway approach, unless already paved, shall be improved in accordance with the <br /> requirements of San Joaquin County Standard R-17 prior to issuance of the occupancy permit. <br /> (Development Title Section 9-1145.5) <br /> c. The owner shall execute an Irrevocable Offer and Agreement to Dedicate Road to result in a 25-foot- <br /> wide right-of-way from the centerline of Frederick Avenue to the property across the parcel's <br /> frontage. A$225.00 fee currently is required for processing, per Development Title Table 9-240.2, in <br /> addition to a copy of the Grant Deed. (Development Title Section 9-1150.5) <br /> d. The Traffic Impact Mitigation Fee will be required for this development. The fee is due and payable <br /> at the time of building permit application. The fee currently is$151.36 per additional daily trip-end <br /> generated in the Ripon area. The fee shall be automatically adjusted July 1 of each year by the <br /> Engineering Construction Cost Index as published by the Engineering News Record. (Resolution R- <br /> 96-592) <br /> e. A copy of the Final Site Plan shall be submitted prior to the release of building permits. <br /> f. Verification shall be obtained from the Solid Waste Division (468-3066)that this development has <br /> addressed the items on the attached Waste Plan Format for Development Projects. The Final Site <br /> Plan is required upon submittal of verification. <br /> 3. PUBLIC HEALTH SERVICES (Staff Contact: Rodney Estrada, 468-0331) <br /> a. A soil suitability study/nitrate loading study outlining all septic and processing waste must be <br /> performed prior to the issuance of building permits and/or approval of the final occupancy permits, as <br /> required by Development Title Section 9-1105.2(d). A review fee of$390.00 must be paid at the time <br /> of submittal to the Environmental Health Division. <br /> Revised Conditions of Approval -3 - UP-00-10 <br />