Laserfiche WebLink
O� N <br /> APPLICATION - COMMERCIAL BUILDING PERMIT <br /> SAN JOAQUIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT <br /> 1810 E. HAZELTON AVENUE, STOCKTON CA 95205 <br /> • �'`% BUSINESS PHO 09) 468-3121 <br /> INSPECTION REQUEST-24 HOUR RE 209)468-3165 <br /> PERMIT <br /> THIS PORTION OF THE APPLICATION MUST BE COMPLETELY FILLED OUT BY THE APPLICANT <br /> IN ORDER TO APPLY FOR PERMITS REQUIRED TO BUILD A COMMERCIAL STRUCTURE. <br /> Scope of Work: Tj t/ <br /> Site Address: 4 f 'C Fuvo CA <br /> OWNER NAME AND ADDRESS APPLICANT NAME AND ADDRESS <br /> Name: 5 G7 pc ^ft• UC, Name:C-1 N5<S-",k40 ipro a re P"a Oro <br /> Address: G. r Address: r-IS4j E Frc-w �-o S <br /> City: ( State: City: S v� State: <br /> ZIP: jCpkO PZIP: <br /> CONTRACTOR INFORMATION Ph:( ) <br /> Lic.No: Company Name: <br /> Address: City: St: ZIP: <br /> DESIGNER INFORMATION Ph:(Ze yr <br /> Lic.No: Company Name: i r'er� '�eR r <br /> Address: gb4s Avc ty: Sr©c1r fc St: CA ZIP: 4 <br /> BUSINESS INFORMATION Business Owner: <br /> Business Name(DBA): Mailing Address: <br /> CHECKLIST <br /> THE FOLLOWING INFORMATION AND DOCUMENTATION MUST BE SUBMITTED TO DEVELOPMENT Check <br /> SERVICES BEFORE YOUR APPLICATION CAN BE PROCESSED. off <br /> 1. One completed application for a Commercial Building Permit. <br /> 2. Three complete sets of construction drawings prepared by an architect or engineer. (NOTE: All sheets of the working <br /> drawings must be stamped and wet signed prior to issuance of permit.) The plans must include: <br /> • Site plan. (NOTE: See the Site Plan Check List regarding requirements for the Site Plan.) <br /> • Structural plans. <br /> • A complete floor plan, including room usage, exiting plan and complete dimensions. (NOTE: For remodels and <br /> additions,the existing and proposed floor plans must be shown in their entirety.) <br /> • Plumbing and mechanical plans,including ventilation. <br /> • Electrical plans, including a complete one-line diagram of the service and feeders. <br /> • Disabled Access compliance. <br /> 3. Two sets of structural calculations,stamped and signed with a wet signature. <br /> 4. Two sets of complete construction specifications. <br /> 5. If prefabricated trusses are included in the scope of work,two sets of the following are required: <br /> • Complete truss layout designating each type of truss to be used. <br /> • Engineered truss plans and calculations which are cross-referenced to the truss layout plan. <br /> • Lateral bracing plans. <br /> • Details of any special features such as girder trusses, hangers between interconnected trusses,connections <br /> between trusses and beams,etc. <br /> • A letter signed by the responsible engineer or architect,stating that he/she has reviewed and approved the truss <br /> calculations and drawings,or either a shop approval stamp and signature or the responsible engineer's or architect's <br /> stamp and signature. <br /> 6. Two sets of non-residential energy calculations with all required forms imprinted on the drawings. <br /> 7. One extra copy of the floor plan. Section 72 of the Revenue and Taxation Code now requires a copy of a complete floor <br /> plan of the proposed work to be given to the County Assessor. <br /> 8. One extra site plan to be given to the Department of Public Warks at the time of Building Permit application. <br /> 9. One copy of a completed Hazardous Materials Disclosure Survey form is required if the building permit application does <br /> not re vire discretions approval e. ., Use Permit or Site Approval). Surveyform is attached. <br /> 10. Permit Deposit <br /> cwmnww.uruw mocm.n.vn_rrwuc•ru,w..-.,x,o-,u...,�.,..,,, panp f of ri <br />