Laserfiche WebLink
Conditions <br /> Use Permit Application No. PA-0400206 was approved by the Planning Commission on The <br /> effective date of approval is . This approval will expire on , which is 18 months from the <br /> effective date of approval, unless (1) all Conditions of Approval have been complied with, (2) all <br /> necessary building permits have been issued and remain in force, and (3) all necessary permits from <br /> other agencies have been issued and remain in force. <br /> Unless otherwise specified, all Conditions of Approval and ordinance requirements shall be fulfilled <br /> prior to the establishment of the use and the issuance of any building permits. Those Conditions <br /> followed by a Section Number have been identified as ordinance requirements pertinent to this <br /> application. Ordinance requirements cannot be modified, and other ordinance requirements may <br /> apply. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT (Staff Contact:: Rick Griffin, [209]468-3154 ) <br /> a. BUILDING PERMIT: Submit an "APPLICATION-COMMERCIAL BUILDING PERMIT'. The Site <br /> Plan required as a part of the building permit must be prepared by a registered civil engineer or <br /> licensed architect. This Plan must show drainage, driveway access details including gates, on-site <br /> parking, landscaping, signs, fencing, existing and proposed utility services, and grading (refer to the <br /> "SITE PLAN CHECK LIST" for details). A fee is required for the Site Plan review (Development <br /> Title Section 9-884) <br /> b. APPROVED USE: This approval is for the meeting of up to 35 people for religious assembly in an <br /> existing 500-square-foot garage that will be converted into a meeting room as shown on the Site <br /> Plan dated April 19, 2004. (Use Type: Religious Assembly-Neighborhood) <br /> c. COMPLIANCE DATE: If the religious assembly use continues to operate without the required <br /> permits, the following timeframe shall apply: <br /> (1) Building plans shall be submitted within thirty(30)days from the date of approval. <br /> (2) The Building Permit shall be secured (issued)within sixty (60) days from the date of approval. <br /> (3) All Conditions of Approval shall be completed within 180 days from the issuance of the Building <br /> Permit. <br /> d. STORM DRAINAGE: Storm water drainage shall be retained on-site. The drainage pattern and <br /> corresponding storm drain improvements shall be shown on the Site Plan. Drainage calculations <br /> prepared by a registered civil engineer or architect shall be included. (Development Title Section 9- <br /> 1135) <br /> e. PARKING: Off-street parking shall be provided and comply with the following: <br /> (1) All parking spaces, driveways, and maneuvering areas shall be surfaced and permanently <br /> maintained with base material of appropriate depth and asphalt concrete or Portland cement <br /> concrete to provide a durable, dust free surface. Bumper guards shall be provided when <br /> necessary to protect adjacent structures or properties. (Development Title Section 9- <br /> 1015.5[e)) <br /> San Joaquin County PA-04002061Flamenco <br /> Community Development Page 7 <br />