Laserfiche WebLink
O U!IN <br /> � c COUNTY OF SAN JOAQUIN THOMAS R. FLINN <br /> DEPARTMENT OF PUBLIC WORKS DEPUTY DIRECTOR <br /> P. O. BOX 1810- 1810 EAST HAZELTON AVENUE MANUEL LOPEZ <br /> STOCKTON,CALIFORNIA 95201-1810 DEPUTY DIRECTOR <br /> °a - �P• 209/468-3000 STEVEN DWINKOLER <br /> �i F FAX:209/468-2999 <br /> HEN DIRE TORRATA RFcp, <br /> APR 0 <br /> April 9, 1999 �0mmu°� 91999 <br /> MEMORANDUM <br /> TO: Thomas M. Gau, Senior Civil Engineer <br /> Community Development Department <br /> CONTACT PERSON: Kai Luoma <br /> FROM: Gabriel Karam, Senior Civil EngineerGK <br /> Public Services Division <br /> SUBJECT: SA-99-24 A SITE APPROVAL APPLICATION FOR LIMITED AG RECYCLING <br /> PLANT CONVERTING FUMIGATION PLASTIC TARPING TO BALES FOR <br /> SHIPMENT TO PLASTIC MANUFACTURING PLANT. ALSO CUSTOM AG <br /> MANUFACTURING OF ORCHARD EQUIPMENT SUCH AS NUT HULLERS, <br /> TREE SHAKERS, WOOD SPLITTERS, ETC., LOCATED ON THE NORTH SIDE <br /> OF TERMINOUS OF FRENCH CAMP ROAD AND STATE HIGHWAY ROUTE 120. <br /> (DISTRICT 5). <br /> APPLICANT: John Swier Trust APN: 203-220-22 <br /> INFORMATION: <br /> The site is not currently located within a Federal Flood Insurance Administration Designated Flood <br /> Hazard Area. <br /> French Camp Road has an existing right-of-way width of 60 feet and a planned right-of-way width of <br /> 84 feet. <br /> RECOMMENDATIONS: <br /> 1. Encroachment permit shall be required for work within road right-of-way. <br /> (Development Title Sections 9-1145.4 and 9-1145.5) <br /> 2. The driveway approach shall be improved in accordance with the requirements of San Joaquin <br /> County Standards R-17 prior to issuance of the occupancy permit. <br /> (Development Title Section 9-1145.5) <br /> 3. The Traffic Impact Mitigation Fee will be required for this development. The fee is due and <br /> payable at the time of building permit application. (The fee currently is $144.23 per additional <br /> daily trip-end generated in the Ripon area. The fee shall be automatically adjusted July 1 of <br /> each year by the Engineering Construction Cost Index as published by the Engineering News <br /> Record.) <br /> (Resolutions R-90-304, R-91-1025, R-93-167, R-94-179, R-95-650 and R-96-592) <br /> 4. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 5. Verification shall be obtained from the Solid Waste Division ((209) 468-3066) that this <br /> development has addressed the items on the attached Waste Plan Format for Development <br /> Projects. <br /> GK:RH:ti <br /> PS-9DO89.11 <br /> E: Manuel Lopez, Deputy Director/Development <br />