My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0002198
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRENCH CAMP
>
2201
>
2600 - Land Use Program
>
UP-00-04
>
SU0002198
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2020 8:50:10 PM
Creation date
9/4/2019 6:41:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0002198
PE
2626
FACILITY_NAME
UP-00-04
STREET_NUMBER
2201
Direction
E
STREET_NAME
FRENCH CAMP
STREET_TYPE
RD
City
FRENCH CAMP
APN
17710031
ENTERED_DATE
10/23/2001 12:00:00 AM
SITE_LOCATION
2201 E FRENCH CAMP RD
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\F\FRENCH CAMP\2201\UP-00-04_GP-99-11_GP-00-02_ZR-00-4\SU0002198\MISC.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PA� N USE PERMIT <br /> N K SAN JOAQUIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT <br /> FILE NUMBER: UP- <br /> 4c;Fop 1810 EAST HAZELTON AVENUE, STOCKTON, CA 95205 <br /> TELEPHONE: (209) 468-3120 <br /> BUSINESS HOURS: 8:00 a.m. to 5:00 p.m. <br /> (Monday through Friday) <br /> .�IN't Ska5ti ` sit -0 d <br /> .yr .APPWCATIONPRSSINSr r✓ rg ,..t. <br /> STEP 1 CHECK WITH STAFF- Community Development Staff will explain the requirements and procedures to you <br /> STEP SUBMIT YOUR APPLICATION- When you apply,file all of the following: <br /> • FEE The staff will/at you know the current cost of filing an application. Make checks payable to the San Joaquin <br /> County Treasurer. <br /> • FORM Seven(T)copies of the completed application Information forms(attached)which all owners must sign, <br /> • SITE PLAN Seven(7)copies of a folded Site Plan(see attached)and two(2)copies of an 8-1/2' x 11-reduced copy of the <br /> plan. <br /> • HAZARDOUS One copy of a completed Hazardous Materials Disclosure Survey form(a copy of the form Is attached). <br /> MATERIALS <br /> • DEED One copy of the recorded deed(s)of the property. <br /> • SERVICES If your project requires connection to public facilities,you must submit a'will-serve'letter from the appropriate <br /> water,sewer and drainage entities at the time of filing, This letter must Include a statement from the agency that <br /> they will serve the proposed development,and has,or will have,the capacity to provide such service. <br /> APPLICATION Staff will check your application. If anything Is missing,you will be notified In writing. The applicant will be sent a <br /> COMPLETE postcard once the application has been determined complete. (Your application cannot be processed until It Is <br /> complete.) <br /> STEP 3 APPLICATION PROCESSING <br /> • CEQA The County will decide If the proposal will have an adverse effect on the environment. If there are no adverse <br /> effects,the application will be processed. If there are potential adverse effects,further environmental review will <br /> be required. Projects that have the potential to adversely affect the environment will require the preparation of an <br /> E.I.R. This may extend the processing time. <br /> • REFERRALS Staff will refer the application to any County departments,other agencies and surrounding property owners <br /> AND ACTION affected by your proposal. At the end of a review and comment period a staff report will be prepared and the <br /> Planning Commission will hold a public hearing. If the Commission can make the required findings,the <br /> application will be approved. Typically action will be taken by the Commission within 8 weeks after application. <br /> • FINAL ACTION The action of the Commission can be appealed to the Board of Supervisors. The Commission's action Is final <br /> unless appealed. For further Information on the length of the appeal period,contact the staff. <br /> STEP 4 CONDITIONS AND ADDITIONAL PERMITS <br /> CONDITIONS The staff will send you the final action and If if Is approval It will list conditions,by department,that must be met <br /> before you can start your project. <br /> IMPROVEMENT In addition to the Site Plan,an Improvement Plan Is frequently required as a condition of approval. This Is an <br /> PLANS engineered plan showing drainage,grading,frontage Improvements,access,on-and off-site service and utility <br /> facilities,landscaping and circuiatlon/parking details. <br /> • DRIVEWAY Driveway Permits must be acquired from the Community Development Department for any work performed within <br /> PERMITS the road right of way. If the project fronts on a state highway these permits are obtained from Caltrans. <br /> SANITATION 8 Projects that will utilize new on-site sanitation disposal and/or on-site wells,must get permits from the <br /> WELL PERMITS Environmental Health Division. <br /> • BUSINESS If the project Involves a business,a Business License must be approved prior to starting operation. Business <br /> LICENSES License applications can be processed concurrently with the Use Permit application. <br /> BUILDING If the project Involves construction a building permit must be approved prior to commencement of work. <br /> PERMITS <br /> • OTHER PERMITS Frequently other local,state and/or federal agencies will require permits prior to now uses being established(e.g. <br /> Air Pollution Control District,Regional Water Quality Control Board or the SherffPs Office). The Community <br /> Development Department will Identify additional permits we are aware of that may be required for your project <br />
The URL can be used to link to this page
Your browser does not support the video tag.