My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0003172
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRENCH CAMP
>
2771
>
2600 - Land Use Program
>
SA-92-57
>
SU0003172
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2020 11:56:50 AM
Creation date
9/4/2019 6:41:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0003172
PE
2633
FACILITY_NAME
SA-92-57
STREET_NUMBER
2771
Direction
E
STREET_NAME
FRENCH CAMP
STREET_TYPE
RD
City
MANTECA
Zip
95336
ENTERED_DATE
11/6/2001 12:00:00 AM
SITE_LOCATION
2771 E FRENCH CAMP RD
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
FilePath
\MIGRATIONS\F\FRENCH CAMP\2771\SA-92-57\SU0003172\APPL.PDF \MIGRATIONS\F\FRENCH CAMP\2771\SA-92-57\SU0003172\CDD OK.PDF \MIGRATIONS\F\FRENCH CAMP\2771\SA-92-57\SU0003172\EH COND.PDF \MIGRATIONS\F\FRENCH CAMP\2771\SA-92-57\SU0003172\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Conditions of Approval <br /> SA-92-0057 <br /> Page 2 <br /> by a credit toward the former use (truck stop) as <br /> "Manufacturing" at $1, 102 . 00 per 1, 000 gross square foot <br /> of building. The fee shall be automatically adjusted <br /> July 1 of each year by the Engineering Construction Cost <br /> Index as published by the Engineering News Record. ) <br /> (Resolution R-90-304, R-91-1025) <br /> b. The Water Supply Facilities Impact Mitigation Fee will be <br /> required for this development. The fee is due and <br /> payable at the time of building permit application. (The <br /> Fee currently is $88 .89 per 1, 000 gross square foot of <br /> building as "Warehouse. " The fee can be exempted if the <br /> building floor area addition is 200 square feet or less. <br /> The fee shall be automatically increased on January 1 of <br /> each year at the rate of 6. 9 percent. An additional 3 . 5 <br /> percent shall be added to the fee upon payment for <br /> processing and administering the program. (Resolution . <br /> R-91-327) <br /> 3 . PUBLIC HEALTH SERVICES <br /> a. The structure shall only be for dry storage of <br /> pesticides. <br /> b. No mixing of liquid or powders with liquids shall be <br /> permitted. <br /> 4. BUILDING INSPECTION DIVISION <br /> a. The following Uniform Building Code and San Joaquin <br /> County Ordinance requirements will be applicable and <br /> shall be incorporated in the construction plans before <br /> submittal to the Building Inspection Division: <br /> (1) Exterior walls less than 20' (feet) from a property <br /> line shall be of one-hour, fire-resistive <br /> construction. <br /> (2) The existing building shall be provided with an <br /> automatic fire sprinkler system. <br /> (3) The proposed use will change the occupancy from an <br /> H-4 occupancy to an H-7 occupancy (U.B.C. Section <br /> 502) . The structure must be brought into <br /> compliance with all current code provisions <br /> including structural, plumbing, mechanical, <br /> electrical, energy, and handicap requirements. <br /> (4) Provide restrooms conforming with all disabled <br />
The URL can be used to link to this page
Your browser does not support the video tag.