Laserfiche WebLink
REQUIREMENTS: <br /> The applicant shall complete the following requirements before the Department of Public Works can <br /> support or deem complete the Tentative Map for this project: <br /> 1. The applicant shall submit verification of the right (or the ability to obtain the right) to access French <br /> Camp Road via the thirty(30) foot right-of-way as shown on the Tentative Map. Demonstration of <br /> the right to access applies to both private lands and the Union Pacific Railroad right-of-way. <br /> (Development Title Section 9-1100.9) <br /> 2. The applicant shall provide evidence of the approval by the Union Pacific Railroad Company of <br /> construction of the required grade crossing across their facility. The access road including the grade <br /> crossing shall be required to meet Improvement Standard No. 922.2.2 of the San Joaquin County <br /> Chiefs Association for fire apparatus access roads. <br /> Upon satisfaction of the above requirements, the following Conditions of Approval shall apply: <br /> RECOMMENDATIONS: <br /> 1. A Parcel Map is required. (Development Title Section 9-915.2) <br /> 2. An encroachment permit shall be required for work within road right-of-way. <br /> (Development Title Sections 9-1145.4 and 9-1145.5) <br /> 3. The driveway approach shall be improved in accordance with the requirements of San Joaquin County <br /> Standards, R-17 prior to issuance of the occupancy permit. (Development Title Section 9-1145.5) <br /> 4. Remainder shall be designated as "Designated Remainder" on Parcel Map. <br /> (Subdivision Map Act Section 66445) <br /> 5. All easements of record shall be shown on the Parcel Map. (Development Title Section 9-910.20) <br /> Note: Any construction activity that results in the disturbance of at least one (1) acre of soil shall <br /> require a State NPDES construction permit. <br /> DG:DS:av <br /> PACOMMENTSWSWR 2007\PA-0700162 revision.do <br />