Laserfiche WebLink
Summer: Volume= 30,000 gal/d(6.1 days)(1 ft3/7.48 gal) <br /> =24,465 ft3 <br /> Surface area= (24,465 ft'/6 ft)(1 ac/43,560 ft1) = 0.10 acres <br /> Therefore, winter condition requirement of 0.22 acres control surface area design. <br /> SE. Surface loading: lb BODS/acreed = (0.03 34 b 1/Mgal((mg/ 1)550 �1) 50.25 50 lbs BOD5/acreeday <br /> Therefore, increase pond surface area to 0.5 acres to reduce BOD5/acreoday to 275 lbs. <br /> E. FACULTATIVE TREATMENT POND STORAGE VOLUME <br /> Volume (ft') _ (LWxLLxLD)-[(SxLD1)(LW+LL))+(4xS1xLD'+3) <br /> ft' = (150 ftx150ftx6ft) - [(2x61)x (150ft+ 150ft) + (4x21 x63= 3) = <br /> ft3 = 135,000 - 21,600 + 1152 = 114,552 ft3 <br /> Gals = 114,552 ft'x 7.48 gal/ft' = 856,850 gallons <br /> rainfall = (22,500 ft2)(9.6 in total rainfall)(7.48 gal1ft') - 12 in/ft) = 134,600 gals <br /> evaporation= (0.05 in/day)(120 days)(22,500 ft1)(7.48 gallft') - 12 in/ft= 84,150 gals <br /> Net Gain= 50,450 gals _4 months =+12,600 gal/month during winter months. <br /> Entire Facility is in Zone B - 500 year Flood Plain per FEMA Maps. <br /> F. POND CONSTRUCTION DETAILS AND DESIGN <br /> 1. Embankments: Use of on-site material to construct embankments by excavating four feet <br /> of material to build up four feet of compacted embankment. Top width is to be ten feet for <br /> vehicle traffic. Inner slope to be 2:1, outer slope to be 3:1. Vegetation should be planted <br /> rably low growing grass to prevent erosion. <br /> on the outer embankments, prefe <br /> 2. Pond: Utilize 30 mil HDPE plastic to line entire surface area of inner side embankments and <br /> bottom. One foot overlap at each seam and glued. Four-inch overlength at bottom of <br /> embankment to account for soil compaction. Anchored at top of embankment as detailed <br /> in Appendix. No less than one foot minimum freeboard. Total depth of pond to be eight <br /> feet. Fencing, with warning signs shall be placed around the entire pond. <br /> 3. Piping: Influent and effluent lines to be generally accepted sewer line construction material. <br /> There should be two to three inspection ports on influent line leaving abattoir to the pond <br /> to check for fat, oil and grease (FOG) build-up. Build-up of FOG will require additional <br /> treatment of wastewater before entering pond. Influent lines should be place along the <br /> bottom, near the north end of the pond. A fresh water line must also be installed to maintain <br /> -45- <br /> NaOf y gy R4search <br />