My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0011068
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREWERT
>
920
>
2600 - Land Use Program
>
PA-1600212
>
SU0011068
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:34:56 AM
Creation date
9/4/2019 6:44:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0011068
PE
2625
FACILITY_NAME
PA-1600212
STREET_NUMBER
920
Direction
W
STREET_NAME
FREWERT
STREET_TYPE
RD
City
LATHROP
Zip
95330-
APN
19126022
ENTERED_DATE
9/23/2016 12:00:00 AM
SITE_LOCATION
920 W FREWERT RD
RECEIVED_DATE
9/23/2016 12:00:00 AM
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\F\FREWERT\920\PA-1600212\SU0011068\APPL.PDF \MIGRATIONS\F\FREWERT\920\PA-1600212\SU0011068\EHD COND.PDF \MIGRATIONS\F\FREWERT\920\PA-1600212\SU0011068\BOS OK.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the overs are stored on site,they will be also be stable and will remain on site for well <br /> under the 6 month requirement. <br /> Finished product <br /> The finished compost product is placed into separate piles where it is either sold directly in <br /> bulk, or mixed with other amendments to form specialized products. This material is <br /> certified organic. It is sold to landscapers and agriculture. All material is sold well within <br /> the six month required hold time. There is a higher demand than there is supply of the <br /> finished compost. <br /> Fire Protection <br /> Valley Organics will abide by the current California Fire Code and all related standards)CFC <br /> 2010, 1908). In addition,Valley Organics will operate under the fire protection plan developed <br /> with the cooperation of the Lathrop/Manteca Rural Fire Department. <br /> Highlights of the Plan include the following operational parameters. <br /> Provide approved knox box security box to allow fire department access to the site; <br /> conduct weekly monitoring and recording of the feedstock materials in accordance with <br /> approved plan; incorporate all incoming feedstock within three (3)days of receipt, including <br /> isolation of any identified "Hot Spots"; keep piles under 25'in height, 150' in width, and <br /> 250' in length ; all access roads,including the separation between the feedstock piles, shall <br /> have an unobstructed width of not less than 20'and have an unobstructed vertical <br /> clearance of not less than 13'6" and converted to "all-weather"accessible surface; provide <br /> labeling and signage for storage of flammable liquids; provide training for employees on fire <br /> prevention. <br /> The following equipment and procedures will also be available in the event of fire: <br /> Contact local Fire Department(LathropJManteca Rural)immediately; <br /> Maintain equipment on site to extinguish fire: water truck, loaders, hoses; <br /> Ensure adequate water supply on site and ability to access water: downspout,sprinklers; <br /> Provide adapter that fits with water spout and fire truck and keep accessible on site; <br /> Remove burning material from pile to designated area via loaders; <br /> Extinguish burning or hot material in smaller piles; <br /> Separate fire from equipment and other piles; <br /> Apply water to surface fires if caused by reason other than spontaneous combustion;and <br /> Provide a lock box so the Fire Department can open the gate and access the site at any <br /> time. <br /> Equipment <br /> The following equipment will be used for the upgraded facility. All of this equipment is <br /> currently on site except the water truck which will be added: one tractor, one windrow <br /> compost turner, one grinder,one dump truck, one trommel screen, two loaders, a scale and a <br /> water truck. The County will be notified of any significant equipment changes, and Valley <br /> Organics will adhere to any additional requirements at that time. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.