Laserfiche WebLink
Section 10-1 Construction Details <br /> Std. Spec. Sec. 70 <br /> Special Si <br /> !!! QUALITY ASSURANCEJQUALITY CONTROL DOCUMENTATIONPage 8 of 8. <br /> Provide the following well development information to the <br /> 1 Engineer_ <br /> 1_ Method of development <br /> 2. Volume of water removed <br /> 3- Water levels, including time of measurement <br /> 4_ Physical description of water removed from well, <br /> including discoloration, clarity and odor <br /> 5_. Physical description of solids removed from well <br /> MEASUREMENT AND PAYMENT. --The Contractor shall be paid for <br /> MISCELLANEOUS FACILITIES - GROUNDWATER MONITORING WELL <br /> INSTALLATION based on an approved lump sum_ <br /> Such payment shall be considered full compensation for all <br /> labor, materials, tools, equipment, overhead, and other work and <br /> incidentals necessary to complete the various work of this <br /> section and no additional compensation will be paid therefor- <br /> N-.\MiScell-aems\Utiamaint\A-,7osi-NLSCFac-Manit-Tqell-W-outpump.doc <br /> herefor_A:\Miscellaaeons\Utiamaint\A-7os1-NLSCFac-Manit-well-w-p¢tpump.doc <br />