My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006578
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
5 (I-5)
>
0
>
2600 - Land Use Program
>
PA-0700226
>
SU0006578
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:36:10 AM
Creation date
9/4/2019 6:46:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006578
PE
2637
FACILITY_NAME
PA-0700226
STREET_NUMBER
0
STREET_NAME
I-5
City
LODI
APN
05515003 04 25
ENTERED_DATE
5/18/2007 12:00:00 AM
SITE_LOCATION
I-5
RECEIVED_DATE
5/18/2007 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\F\I-5\0\PA-0700226\SU0006578\GRD WTR PLN.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION E <br /> SURVEYING DETAILS <br /> Discuss how each well will be sun+e ed to a common reference oint <br /> The survey of new wells will be by using the locations of at least two existing nearby monuments for <br /> control <br /> SECTION F <br /> SOIL SAMPLING (if applicable) <br /> Cutting disposal metho P readin in a maximum Z--inch thick layer inthe <br /> The Contractor shall dispose of soil cutting s s by p g <br /> vicinity of the borehole. <br /> See Standard Specification Section 70, DRILLWG, paragraph B, pg E- <br /> Anal sesto be run and methods <br /> The Contractor shall retrieve soil cutttiorT and <br /> ings and describe tracto per A recordW486re ate Pbearingzon� <br /> Identification of Soils (Visual-Manual Procedure)- <br /> are encountered and zones exhibiting drilling problems_ <br /> Sam le collection and reservation method <br /> Not applicable at this time. Samples are not intended to be collected atthis time. <br /> Intervals at which soil samples aceto be collected <br /> -----actor shall collect representative soil cuttingsforcharaderrzation on no greatertham5foot <br /> The <br /> intervals- <br /> See Standarci SpecifilcatiOn Section 70, DRILLJNGr paragraph <br /> ntervals_SeeStandarciSpecifilcationSection70, DRILLINGrparagraph-A pg 4- <br /> Number—of—s-011 <br /> .Numberofsoil samples and rationale <br /> E Not applicable at this time. Samples will not be collected- <br /> 13 <br /> j 069992cedures <br /> Contradorshallprovidethefollowingwelldevelopmentinformation- <br /> — -- <br /> - 1) Method of development- <br /> 2). <br /> evelopmentZ). Volume of water removed. <br /> 3) Water levels, including time of measurementand-odor.4) Physical description of water removed from well, including discoloration, clarity <br /> 5� Physical description of solids removed from welL <br /> See Standard Specification Section 70, QUALITY ASSURANCEIQUAL(rY CONTROL <br /> DOCUMENTATION, pg 9. <br /> a <br /> Grmr&va QMwitming Wait Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.