Laserfiche WebLink
Table 5: Gallons of TPH-Gas removed by Internal Combustion Engine (I.C.) <br /> City of Escalon <br /> 1305 Escalon,Ave. <br /> Escalon,CA <br /> Project No.: 750.3 <br /> Actual Adjusted Avg.OVM Avg.Vapor Avg.Air vapor Cum. <br /> days in Vapor OVM OVM for Lab data Lab data Concentration Air Flow Flow(CFM) removal extracted gallons <br /> Date/Time Cum.Days period Well# (ppm) (ppm)` Period (ppm) (mg/1) (mg/L) (cfm) for Period lbs./day Cum.lbs. gal/day removed <br /> I.C..Startup <br /> 2/5/02 10:081 0.001 1 3 1 3011 12041 1 11001 4.61 1 60 <br /> 2/14/02 9:541 8.991 1 3 1 2571 10281 1 1 1 1 35 <br /> 2/27/02 10:351 22.021 22.021 3 1 961 3841 8721 1 13.621 451 471 15.2 1 334 2.4 54 <br /> IC Shutdown to high emmisions. <br /> IC Restart <br /> 4/22/0213:00 22.02 4 25 <br /> 4/30/0210:44 29.93 4 1 8631 34521 1 49001 20 20 <br /> 5/18/0215:10 48.11 26.091 4 1 1 1 1 1 20 221 39.0 1 1,3511 6.3 218 <br /> I.C.Failed nite of the 18th <br /> I.C.Restart <br /> 6/14/0217:10 48.11 4 50 <br /> 6/18/02 7:45 51.72 4 525 2100 2400 9.80 32 <br /> 7/18/02 9:19 81.78 4 326 1304 1300 5.50 50 <br /> 8/14/02 8:30 108.75 60.64 4 346 1000 4.30 6.53 45 44 26.0 2,927 4.2 472 <br /> 8/14/02 8:30 108.75 346 1000 4.30 45 <br /> 9/17/02 7:15 142.70 4 3421 1 1 6101 2.50 1 38 <br /> 10/25/0211:35 180.88 4 364L 1 6101 2.50 1 55 <br /> 11/14/0213:36 200.96 4 4351 1 4801 2.00 1 50 <br /> 12/10/02 8:30 226.75 118.00 4 2281 1 3601 1.50 2,561 471 47 10.8 4,2031 1.7 678 <br /> Shut VETS down(Spike Test) <br /> VETS Restart <br /> 1/1/0310:40 226.75 4 197 <br /> 1/1/0311:40 226.79 4 238 320 1.30 50 <br /> 1/2/03 8:00 227.64 4 185 450 1.90 45 <br /> 1/27/03 8:00 252.64 4 134 210 0.89 45 <br /> 1/31/03 8:35 256.66 29.91 4 168 1.40 50 48 6.0 4,381 1.0 707 <br /> VETS Shutdown <br /> OVM readings adjusted by a factor of 4.0 from 2/5/02 thru 12/22/01 to bring them into line with lab data. <br /> ljeoG�ica!?eclinics?nc. 4/10/03 <br />