Laserfiche WebLink
i <br /> TABLE OF CONTENTS <br /> 1.0 INTRODUCTION <br /> ., 1.1 Site Geology & Field Observations <br /> 1.2 Site Hydrology <br /> 1.3 Mass Balance <br /> 2.0 FEASIBILITY STUDY <br /> 2.1 Proposed Vadose Zone Cleanup Alternatives <br /> 2.1.1 Excavation <br /> 2.1.2 Remediation By Natural Attenuation <br /> 2.1.3 Soil Vapor Extraction <br /> 2.2 Soil Vapor Extraction Pilot Test Results <br /> 2.3 Groundwater Cleanup Alternatives <br /> 2.4 Conclusion of Feasibility Study <br /> 2.5 Remediation Goals <br />{ 3.0 VAPOR EXTRACTION—REMEDIAL ACTION <br /> _ 3.1 Proposed Vapor Extraction Wells <br /> 3.2 Proposed Air Recharge Wells <br /> i <br /> 3.3 Piping& Manifold System <br /> 3.4 Utilities <br /> 3.5 Extraction Blower <br /> 3.6 Emissions Treatment System <br /> j 3.7 Installation & Startup <br /> f--. 4.0 OPERATION & MAINTENANCE <br />{ <br /> 5.0 ASSESSMENT OF REMEDIAL EFFECTIVENESS <br /> 5.1 Effectiveness Testing <br /> 5.1.1 Radius of Influence <br /> 5.1.2 Rate of Contaminant Removal <br /> 5.2 Monitoring& Laboratory Analysis <br /> 5.2.1 Groundwater Monitoring <br /> 5.2.2 Soil Vapor Influent&Emission Monitoring <br /> 5.3 Confirmation Testing <br /> 5.3.1 Soil Vapor <br /> j 5.3.2 Soil Samples <br /> 5.3.3 Groundwater <br /> 6.0 SCHEDULING& REPORTING <br /> 7.0; SIGNATURES & CERTIFICATION <br /> i <br />