Laserfiche WebLink
Geological Tulutics Inc. Page 3 <br /> Groundwater Monitoring Report <br /> Project No.750.2 <br /> February 16,2005 <br /> In February 2002 the soil vapor extraction system was initiated and has operated for <br /> approximately one year. Contaminant mass estimate calculations show that approximately <br /> 50% of the petroleum hydrocarbons contained in the subsurface at this site has been removed. <br /> The groundwater at this site is free of petroleum hydrocarbon contamination and possibly as <br /> much as 600 gallons of gasoline may remain in the vadose zone. <br /> On March 28, 2003, GTI submitted the Work Plan for Additional Site Characterization. The <br /> work plan was approved, with reservation,by Lori Duncan in a letter dated April 8, 2003. <br /> On June 6, 2003, GTI prepared and submitted the Work Plan— Treatment System Feasibility <br /> Study. In a letter dated June 23, 2003, Ms Duncan requested that SCJEHD be notified once a <br /> decision was made on the method to be employed at the site. The letter requested that <br /> remediation should resume as soon as possible. <br /> On September 4 and 5, 2003, GTI and Gregg Drilling & Testing Inc. (Gregg) staff arrived at <br /> the site and advanced two soil borings per the March 28, 2003 work plan. Details of the <br /> event are discussed in GTI's Interim Soil Investigation Report dated October 2, 2003. <br /> GTI obtained Fund approval and an Authority to Construct permit to reinstall and operate the <br /> Internal Combustion System (IC) at the COE site. The IC was switched on, inspected by the <br /> San Joaquin Valley Air Pollution Control District (SJVAPCD) on December 9, 2003, and <br /> operated until January 14, 2004. <br /> On February 12, 2004, GTI prepared and submitted the Work Plan — Modified Vapor <br /> Extraction Treatment System. The work plan was approved by Ms Duncan in a letter dated <br /> February 20, 2004. The IC unit was removed from the site in February 2004. <br /> On September 24, 2004, a Soil Vapor Extraction — Granulated Activated Carbon System <br /> (SVE) was installed at the site. The new system has been in continuous operation since <br /> September 24, 2004, with one exception. The system was shut down between November 30, <br /> 2004 and December 16, 2004 for modification of the water knockout system. <br /> On November 10, 2004, GTI submitted the 3rd Quarter Groundwater Monitoring Report <br /> recommending a modification of the analysis for fuel oxygenates. The recommendation was <br /> approved by SJCEHD.in a letter dated December 13, 2004. This report documents the results <br /> of analysis by EPA method 8260 for the 4th quarter monitoring event. Analysis by EPA <br /> method 8260 will continue on an annual basis during the 4th quarter of each year. <br /> u <br /> r <br />