My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0011094
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ESCALON
>
1329
>
3500 - Local Oversight Program
>
PR0544806
>
ARCHIVED REPORTS XR0011094
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2019 8:54:00 AM
Creation date
9/5/2019 8:35:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011094
RECORD_ID
PR0544806
PE
3528
FACILITY_ID
FA0000293
FACILITY_NAME
Pershing Holdings, Inc. DBA Esclon Arco
STREET_NUMBER
1329
STREET_NAME
ESCALON
STREET_TYPE
Ave
City
Escalon
Zip
95320
APN
22510003
CURRENT_STATUS
02
SITE_LOCATION
1329 Escalon Ave
P_LOCATION
06
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
cieological recluucs Inc, Page 5 <br /> Groundwater Monitoring Report <br /> Project No. 750.2 <br /> October 5,2001 <br /> that biodegradation of the contaminants is at a rate sufficient enough to keep the <br /> BTEX/TPH-G plume in a small area around the source without depleting the oxygen to <br /> 3 <br /> a level to slow the reaction process. <br /> k <br /> Recommendations: <br /> • Quarterly groundwater monitoring will continue at the site. The next event will occur <br /> by November 30, 2001. <br /> 0 A Vadose Zone Remediation - Corrective Action Plan has been approved by San <br /> Joaquin County PHS/EHD and cost pre-approval from the USTCFP is pending. The <br /> fproject is in a public comment period and cannot be initiated until this period and <br /> Lr subsequent evaluation/action have elapsed. We recommend that the vapor extraction <br /> system be operated for a few months to remove the high concentrations of leachable <br /> contaminants and then this site be closed. <br /> 3.0 LIMITATIONS <br /> This report was prepared in accordance with the accepted standards and practices of the <br /> field of environmental geology, groundwater hydrology and good business practices. It <br /> should be recognized that definition and evaluation of environmental conditions is a <br /> difficult and an inexact science. Judgments leading to conclusions and recommendations <br /> are generally made with an incomplete knowledge of the site-specific conditions present. <br /> i <br /> r The tasks proposed and completed during this project were reviewed and approved by the <br /> local regulatory agency for compliance with the law. No warranty, expressed or implied, is <br /> made. <br /> CY <br /> L� <br /> { <br />
The URL can be used to link to this page
Your browser does not support the video tag.