Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
Geo togicat7ecFinics Inc. <br /> City of Esca2on Page 7 <br /> { Project No. 750.3 <br /> October 31,2000 <br /> Soil boring, sampling and testing work will follow the protocol outlined in the work plan for <br /> Additional Site Investigation dated June 29, 2000. <br /> 4.3.3 Groundwater <br /> Until the actual cleanup goals are established it is assumedfor the purposes <br /> process), that there will be four quarters of post-remedial groundwater monitorring conduccted <br /> to confirm that remediation was successful. Groundwater sampling and testing work will <br /> follow the protocol outlined in the work plan for Additional Site Investigation dated June 29, <br /> 2000. <br /> 5.0 SCHEDULE & REPORTING <br /> Once approved, it is intended that this Corrective Action Plan be used as the bidding <br /> document for soliciting competitive bids for performing the work. The consultant, upon <br /> being granted the contract, will submit an addendum to this document, which will include: <br /> • copy of the SJVUAPCD AtoC permit application <br /> " • a site specific Health& Safety Plan <br /> • an investigative methods Quality Assurance Program <br /> • identification of the licensed professional geologist/engineer responsible for the project <br /> • identification of the licensed analytical laboratory chosen for the project <br /> It is expected that fieldwork would commence no later than. 30 days after work plan approval <br /> and upon issuance of the appropriate permits. The information gathered during this phase of <br /> work will be presented in a report, which will include a summary of the geology, the results ? <br /> of sample analyses, and professional conclusions and recommendations. Copies of the.report <br /> will be forwarded to both the appropriate County and State regulatory agencies (SC DER"and <br /> CRWQCB). -J <br /> Task Descriptio Completion Data <br /> • Submit Corrective Action Plan to San Joaquin County Oct 31, 2000 <br /> • Receive approval of CAP from San Joaquin County Nov 30, 2000 <br /> + Submit Bids/Cost Pre-Approval pp latest/ �o USTCFP Jan 8, 2001 <br /> + Receive approval of Costs fors ilot Feb 8, 2001 <br /> • Installation and startup of VETS Mar 10, 2001 <br /> • 12 month operation, maintenance and monitoring of VETS Apr 01 to Mar 02 <br />