My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0011102
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ESCALON
>
1329
>
3500 - Local Oversight Program
>
PR0544806
>
ARCHIVED REPORTS XR0011102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2019 8:55:01 AM
Creation date
9/5/2019 8:37:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011102
RECORD_ID
PR0544806
PE
3528
FACILITY_ID
FA0000293
FACILITY_NAME
Pershing Holdings, Inc. DBA Esclon Arco
STREET_NUMBER
1329
STREET_NAME
ESCALON
STREET_TYPE
Ave
City
Escalon
Zip
95320
APN
22510003
CURRENT_STATUS
02
SITE_LOCATION
1329 Escalon Ave
P_LOCATION
06
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
View images
View plain text
Geo togicat7ecFinics Inc. <br /> City of Esca2on Page 7 <br /> { Project No. 750.3 <br /> October 31,2000 <br /> Soil boring, sampling and testing work will follow the protocol outlined in the work plan for <br /> Additional Site Investigation dated June 29, 2000. <br /> 4.3.3 Groundwater <br /> Until the actual cleanup goals are established it is assumedfor the purposes <br /> process), that there will be four quarters of post-remedial groundwater monitorring conduccted <br /> to confirm that remediation was successful. Groundwater sampling and testing work will <br /> follow the protocol outlined in the work plan for Additional Site Investigation dated June 29, <br /> 2000. <br /> 5.0 SCHEDULE & REPORTING <br /> Once approved, it is intended that this Corrective Action Plan be used as the bidding <br /> document for soliciting competitive bids for performing the work. The consultant, upon <br /> being granted the contract, will submit an addendum to this document, which will include: <br /> • copy of the SJVUAPCD AtoC permit application <br /> " • a site specific Health& Safety Plan <br /> • an investigative methods Quality Assurance Program <br /> • identification of the licensed professional geologist/engineer responsible for the project <br /> • identification of the licensed analytical laboratory chosen for the project <br /> It is expected that fieldwork would commence no later than. 30 days after work plan approval <br /> and upon issuance of the appropriate permits. The information gathered during this phase of <br /> work will be presented in a report, which will include a summary of the geology, the results ? <br /> of sample analyses, and professional conclusions and recommendations. Copies of the.report <br /> will be forwarded to both the appropriate County and State regulatory agencies (SC DER"and <br /> CRWQCB). -J <br /> Task Descriptio Completion Data <br /> • Submit Corrective Action Plan to San Joaquin County Oct 31, 2000 <br /> • Receive approval of CAP from San Joaquin County Nov 30, 2000 <br /> + Submit Bids/Cost Pre-Approval pp latest/ �o USTCFP Jan 8, 2001 <br /> + Receive approval of Costs fors ilot Feb 8, 2001 <br /> • Installation and startup of VETS Mar 10, 2001 <br /> • 12 month operation, maintenance and monitoring of VETS Apr 01 to Mar 02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).