My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0011113
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ESCALON
>
1329
>
3500 - Local Oversight Program
>
PR0544806
>
ARCHIVED REPORTS XR0011113
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2019 8:58:32 AM
Creation date
9/5/2019 8:38:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011113
RECORD_ID
PR0544806
PE
3528
FACILITY_ID
FA0000293
FACILITY_NAME
Pershing Holdings, Inc. DBA Esclon Arco
STREET_NUMBER
1329
STREET_NAME
ESCALON
STREET_TYPE
Ave
City
Escalon
Zip
95320
APN
22510003
CURRENT_STATUS
02
SITE_LOCATION
1329 Escalon Ave
P_LOCATION
06
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.0 <br /> Geolgica(Tecfwics Inc. <br /> Well Installation Report Page 4 <br /> City of Escalon <br /> Project No.750.2 <br /> 60 January 31,2000 <br /> N-.01 <br /> 460surface. The wells were cut off five feet below ground surface, capped, covered with steel <br /> plates and buried with dirt. This was done to allow the road, sidewalk and other <br /> improvements to be completed without damaging the wells. See Section 2.2.3 for a <br /> discussion of when and how the wells were brought to ground surface. <br /> 6.4 <br /> 2.2.2 Vapor Extraction Wells <br /> In order to prepare for a vapor extraction pilot test and possible remediation by vapor <br /> 16.0extraction, four (4) soil borings were drilled (2 to a depth of 55 feet and 2 to a depth of 27 <br /> feet) and converted into vapor extraction wells. The borings, VEW-1 and VEW-2 were <br /> drilled at the eastern edge of the site, under the former sidewalk along the old Escalon/Bellota <br /> Road. The borings for VEW-3 and VEW-4 were drilled in the northern part of the <br /> +� excavation, adjacent to the northern dispenser island(Figure 2, Site Map). <br /> The monitoring wells were constructed using 4-inch diameter PVC casing with flush threads. <br /> The table below shows the construction details. The filter pack was surged during placement <br /> to insure maximum filter pack density. <br /> Well .No. Mad' creep slot i ter ac rans. rout ea <br /> Seal <br /> Pea grave - - - <br /> - �. ea grave . - <br /> a grave <br /> - <br /> e -37' <br /> _ <br /> - ea grave -27, 6- <br /> A surface seal was achieved by pumping a neat cement grout via a tremie tube (augmented <br /> with <4% bentonite) from the top of the Transition Seal to within 5 feet of the ground <br /> surface. The wells were cut off five feet below ground surface, capped, covered with steel <br /> plates and buried with dirt. This was done to allow the road, sidewalk and other <br /> improvements to be completed without damaging the wells. See Section 2.2.3 for a <br /> discussion of when and how the wells were brought to ground surface. <br /> '-' 2.2.3 Additional Site Work <br /> On June 27, 1999, the two vapor wells, that are now covered by Escalon/Bellota Road <br /> (VEW-1 &VEW-2), were dug up by GTI and Del Tech personnel using a backhoe. A trench <br /> �. was dug at approximately 4 feet below grade, heading to the west from the vapor wells. <br /> Conveyance piping was laid in the trench and VEW-1 & VEW-2 were hooked to it. The <br /> conveyance piping was stubbed off at approximately 3 feet below ground surface at the <br /> location of where MW-1, VEW-3 and VEW-4 were to be drilled. The trench was backfilled <br /> and compacted. <br /> On September 3, 1999, GTI and Del Tech personnel arrived on site to dig up and finish off <br /> La MW-3. Finishing of this well had been delayed waiting for the center median of <br /> Escalon/Bellota Road to be installed. The well was brought up to ground surface, a locking <br /> cap installed and a well box was placed over the top of the well. The construction contractor <br /> ,r installing the median was supposed to concrete the box in place and finish it flush to the <br /> grade of the median. In late November GTI was notified that the well box had not been <br /> installed and that the concrete median had been finished, leaving the well casing exposed. <br /> On December 16, 1999, Del Tech mobilized to the site and installed a well box over MW-3 <br /> in order to secure it. <br /> Lo <br />
The URL can be used to link to this page
Your browser does not support the video tag.