Laserfiche WebLink
State mater Res urces ControYBoard <br /> Division of Clean Water Progra ns <br /> Winston H.Hickox 2014 T Street•Sacramer► Ca!i'f9rnia 95814•(916)227-4411 <br /> Secretaryfor Mailing Address: P.O.Box 94 f itiAcrarrrerito, fqq is X244-2120 Gray Davis <br /> Environmental FAX(916)227-4530•Internet Address: http://www.swTc vphorne/ustcf Governor <br /> Protection <br /> FEB 29 2000 <br /> John Davis <br /> Mc Dowell & Davis Towing <br /> 1360 Escalon Ave <br /> Escalon, CA 95320 <br /> UNDERGROUND STORAGE TANK CLEANUP FUND PROGRAM,NOTICE OF ELIGIBILITY <br /> DETERMINATION: CLAIM NUMBER 014818; FOR SITE ADDRESS: 1360 ESCALON AVE, <br /> ESCALON <br /> Your claim has been accepted for placement on the Priority List in Priority Class "B"with a deductible <br /> of$5,000. <br /> We have completed our initial review. The next step in the claim review process is to conduct a <br /> compliance review. <br /> Compliance Review: Staff reviews,verifies,and processes claims based on the priority and rank within <br /> a priority class. After the Board adopts the Priority List,your claim will remain on the Priority List until <br /> your Priority Class and rank are reached. At that time, staff will conduct an extensive Compliance <br /> Review at the local regulatory agency or Regional Water Quality Control Board. During this Compliance <br /> Review, staff may request additional information needed to verify eligibility. Once the Compliance <br /> Review is completed, staff will determine if the claim is valid or must be rejected. If the claim is valid,a <br /> Letter of Commitment will be issued obligating funds toward the cleanup. If staff determine that you <br /> have not complied with regulations governing site cleanup,you have not supplied necessary information <br /> or documentation, or your claim application contains a material error,the claim will be rejected. In such <br /> event, you will be issued a Notice of Intended Removal from the Priority List, informed of the basis for <br /> the proposed removal of your claim, and provided an opportunity to correct the condition that is the basis <br /> for the proposed removal. Your claim will be barred from further participation in the Fund, if the claim <br /> application contains a material error resulting from fraud or intentional or negligent misrepresentation. <br /> Record kcgRinz During your cleanup project you should keep complete and well organized records of all <br /> corrective action activity and payment transactions. If you are eventually issued a Letter of Commitment, <br /> you will be required to submit: (1)copies of detailed invoices for all corrective action activity performed <br /> (including subcontractor invoices),(2)copies of canceled checks used to pay for work shown on the <br /> invoices, (3) copies of technical documents(bids,narrative work description,reports),and(4)evidence <br /> that the claimant paid for the work performed(not paid by another party). These documents are necessary <br /> for reimbursement and failure to submit them could impact the amount of reimbursement made by the <br /> Fund. It is not necessary to submit these documents at this time,however, they will definitely be <br /> required prior to reimbursement. <br /> Compliance with Corrective Action Requirements: In order to be reimbursed for your eligible costs of <br /> cleanup incuiTed"after December 2, 1991,you must have complied with corrective action requirements of <br /> Article 11, Chapter 16, Division 3,Title 23,California Code of Regulations. Article 11 categorized the <br /> corrective action process into phases. In addition,Article 11 requires the responsible party to submit an <br /> California EnriroamentelProtecdon Agency <br /> �� Recycled Piper <br />