Laserfiche WebLink
a.. McDowell &Davis Towing <br /> Phase II Groundwater Monitoring Well Installation Report <br /> "- The wells were surveyed for elevation so that a gradient can be determined: <br /> Groundwater Elevations <br /> sw Well Collar Elevation DTW GW Elevation <br /> MW-1 116.98 61.37 55.61 <br /> MW-2 117.5 61.99 55.51 <br /> MW-3 117.28 61.59 55.69 <br /> 2.1 Drilling <br /> Permits were obtained as necessary for all wells (including borings) before <br /> drilling began. The soil boring was accomplished using a mobile mounted <br /> drilling rig employing the use of a hollow stem flight auger no less than 3 1/4- <br /> inch i.d. and 8 718 o.d. <br /> &. <br /> All drilling equipment was thoroughly steam-cleaned before drilling began, to <br /> prevent the introduction of contamination from off site, and between borings to <br /> y prevent cross contamination. <br /> The borings were logged under the direct supervision of a registered professional <br /> using the Unified Soil Classification System. The color, texture, moisture, <br /> plasticity (if applicable), consistency of the earth materials, pertinent soil or <br /> bedrock characteristics, and any evidence of contamination will be noted. All <br /> water-bearing zones and the depths at which they were encountered are noted on <br /> these logs. <br /> ;. All borings were drilled in such a manner as to prevent cross contamination <br /> between strata. Exploratory soil borings within the unsaturated zone were <br /> backfilled with Bentonite and cement. <br /> w. <br /> Upon termination, the boring into the saturated zone was completed as a <br /> monitoring well and backfilled with cement grout, after a 3' Bentonite seal has <br /> *� been placed. The boring for the monitoring well was of a diameter at least 4 <br /> inches greater than the 2-inch diameter of the well casing to be used. <br /> +r The cuttings from the drilling operation were containerized on-site during drilling <br /> for proper disposition. The proper method of disposal will be dependent upon <br /> results of laboratory analysis. This disposal will be the responsibility of the client <br /> unless other arrangements are made. <br /> 2.2 Well Construction <br /> All materials used in well construction were thoroughly cleaned prior to <br /> introduction into the boring. A cement and Bentonite grout was placed at the <br /> '"' bottom of the boring as necessary. After the seal had been allowed to set long <br /> enough to support the weight of the casing, a 2- inch diameter well casing (PVC) <br /> with end cap and factory perforations for placement in the saturated was placed in <br /> the boring. The casing and end caps were threaded, no PVC cement was used. <br /> 4 <br />