Laserfiche WebLink
S = Sufficient; r) <br /> I = Insufficient <br /> S I 600 PERCOLATION TEST INFORMATION SECTION <br /> ❑ 6.1 Site map showing the location,with concise and accurate dimensions of the percolation test holes on the parcel. <br /> F-16.2 The min' um number of shallow and deep percolation tests was performed for each parcel. <br /> lL� ❑ 6.3 Descriptio of the date,time and protocol used to prepare the test hole, including depth and dimensions of hole, <br /> preparation-of hole, and depth of water used to presoak(minimum 12 inches). <br /> ® ❑ 6.4 Description of the date,time and condition of the test hole after the 24-hour soak period (hole still intact, hole dry, <br /> depth to wateuemaining in hole,etc.) <br /> E�3 ❑ 6.5 The test conformed to SJC Policy EHD 02-02(correct depth, diameter,2"gravel,6"water refill,correct readings <br /> recorded). 5 <br /> ® ❑ 6.6 Complete Percolation Test Form (including readings)was provided with REHS verification signature. The rate <br /> was correctly calculated using the last reading. <br /> Ac—" <br /> " , i <br /> ❑ 6.7 Discussion of any potential problems predicted and/or the need for an engineered or alternative septic system. <br /> ®, ❑ 6.8 Discussion of percolation rates in relation to the type, size and location of future leach fields needed at the site. <br /> 7.0 CONCLUSION SECTION <br /> ❑ 7.1 The report was signed and stamped by the appropriately registered individual <br /> Reviewed By: RR-ewed Date: 5 /� <br /> E <br />€ EHD 26-02-003 Page 2 of 3 Soil Suitability Checklist <br />