Laserfiche WebLink
s <br /> Chandler Martin -2- <br /> COMMUNITY DEVELOPMENT <br /> PA-06-186(SA) (REVISION) <br /> 4. The Regional Traffic Impact Fee may be required for this development. The fee is due and payable at the <br /> time of building permit application. The fee currently is$750 per 1000 gross square foot of building. <br /> The fee is based on the current schedule. (Resolution R-06-38) <br /> 5. The Water Supply Facilities Impact Mitigation Fee may be required for this development. The fee is due <br /> and payable prior to issuance of the building permit. (The fee currently is $623 per 1,000 gross square <br /> foot of building designated as Service Commercial. The fee shall be automatically increased on January <br /> 1 of each year through the year 2005 at the rate of 7.66 percent.) <br /> (Development Title Section 9-818.4 and Resolutions R-91-327,R-94-185 and R-97-5) <br /> 6. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 7. Verification shall be obtained from the Solid Waste Division(468-3066)that this development has met <br /> the requirements of the Waste Plan Format for Development Projects. Final Site Plan is required upon <br /> submittal of verification. <br /> 8. Maximum of two(2) employees shall be allowed at the proposed cabinet shoo <br /> 9. Existing house and Droposed shoo shall be remodeled to use low flow toilets prior to finalization of the <br /> site approval. <br /> MRC:sh <br /> PXC6016N WA%"2pp MXOD186(mv ).wpd <br />