Laserfiche WebLink
fr <br /> T <br /> -2- <br /> Memorandum <br /> SA-94-40 <br /> RECOMMENDATIONS: <br /> 1. Encroachment permit shall be required for work within road right-of-way. <br /> (Development Title Section 9-1145.2) <br /> 2. The driveway approach shall be improved in accordance with the requirements of the <br /> San Joaquin County Standards R-17 prior to issuance of the occupancy permit. <br /> (Development Title Section 9-1145.5 <br /> 3. The Traffic Impact Mitigation Fee will be required for additional traffic generated by <br /> this development. The fee is due and payable at the time of building permit application. <br /> The fee currently is $175.52 per daily trip-end generated in the Tracy area. The fee <br /> shall be automatically adjusted on July 1 of each year by the Engineering Construction <br /> Cost Index as published by the Engineering News Record. {Resolution R-90-304, <br /> R-91-1025, R-93-167, R-94-174} <br /> RWH:JZ:ti <br /> c: Manuel Lopez, Deputy Director/Development <br />