Laserfiche WebLink
CONDITIONS OF APPROVAL <br /> PA-1900127 <br /> GURDWARA GUR NANAK PARKASH, INC. <br /> Use Permit Application No. PA-1900127 was approved by the Planning Commission on May 7, 2020. <br /> The effective date of approval is May 17, 2020. This approval will expire on November 16,2021,which <br /> is eighteen (18) months from the effective date of approval, unless(1)all Conditions of Approval have <br /> been complied with, (2) all necessary building permits have been issued and remain in force, and (3) <br /> all necessary permits from other agencies have been issued and remain in force. <br /> Unless otherwise specified, all Conditions of Approval and ordinance requirements shall be fulfilled <br /> prior to the establishment of the use and the issuance of any building permits. Those Conditions <br /> followed by a Section Number have been identified as ordinance requirements pertinent to this <br /> application. Ordinance requirements cannot be modified, and other ordinance requirements may <br /> apply. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT(Contact: [209]468-3121) <br /> a. BUILDING PERMIT: Submit an"APPLICATION-COMMERCIAL BUILDING PERMIT". The Site Plan <br /> required as a part of the building permit must be prepared by a registered civil engineer or licensed <br /> architect. This Plan must show drainage, driveway access details including gates, on-site parking, <br /> landscaping, signs, existing and proposed utility services, and grading (refer to the "SITE PLAN <br /> CHECK LIST"for details). Foundation and soils investigation shall be conducted in conformance with <br /> Chapter 18 of the California Building Code at the time of permit application. A fee is required for the <br /> Site Plan review. (Development Title Section 9-884) <br /> b. APPROVED USE: This approval is for the expansion of an existing religious assembly in two (2) <br /> phases over four(4) years. The proposal includes increasing the maximum seating capacity from <br /> 170 to 700. (Use Type: Religious Assembly —Regional) <br /> 1. Phase 1 - Includes the following: <br /> • Construction of a 28,965-square-foot assembly hall. <br /> • Construction of a 250-square-foot well house. <br /> • Construction of a 700-square-foot fire suppression water pump house. <br /> • Construction of a 6,453-square-foot porch and hallway structure to connect the proposed <br /> assembly hall with a future social hall. <br /> • Conversion of an existing 6,150-square-foot agricultural building into a storage building. <br /> 2. Phase 2 - Includes the following: <br /> • Construction of a 17,715-square-foot social hall with a kitchen, dining area, and retreat <br /> area. <br /> These Conditions of Approval supersede the Conditions of Approval for Use Permit No. UP-96-0006 <br /> and are in addition to the Conditions of Approval for SA-94-0040. <br /> Previously Constructed Approved Structures: <br /> • 4,920-square-foot assembly hall <br /> • 1,409-square-foot office/garage <br /> • 2,500-square-foot residence(priest's house) <br /> • 4,250-square-foot residence <br /> • 320-square-foot shed <br /> • Ninety-six(96)square-foot shed <br /> PA-1900127—Conditions of Approval 1 <br />