Laserfiche WebLink
-3- <br /> Community Development Department <br /> PA-1900127(UP) <br /> improvements must be completed prior to issuance of the certificate of occupancy for phase one of the <br /> project.(Development Title Section 9-1150.2) <br /> a) Provide an overflow parking lot that can accommodate 100 additional parking spots for occasional <br /> high parkhig demand.The overflow parking lot shall at a minimum be graded soil that will <br /> accommodate storm drainage runoff. <br /> b) Construct a 580 foot long eastbound left-turn lane on W.Grant Line Road ap rop achin t(g ie main <br /> project entry. <br /> c) Construct a two-way left-turn lane on W.Grant Lhie Road extending easterly from the project's <br /> main entrance and continuing 450 feet easterly from the east entrance. <br /> d) Construct a westbound right-turn lane from the west entrance and continuing 100 feet easterly from <br /> the cast entrance. <br /> e) Stripe and sign the west entrance access to indicate the following movements are allowed: <br /> i. Riiplit in. <br /> H. Right out. <br /> AC:CH <br />