My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012397
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
16151
>
2600 - Land Use Program
>
PA-1900127
>
SU0012397
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2020 8:52:23 AM
Creation date
9/5/2019 10:43:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012397
PE
2626
FACILITY_NAME
PA-1900127
STREET_NUMBER
16151
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95304-
APN
209191033
ENTERED_DATE
6/28/2019 12:00:00 AM
SITE_LOCATION
16151 W GRANT LINE RD
RECEIVED_DATE
6/17/2019 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
TSok
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\16151\PA-1900127\SU0012397\APPL.PDF \MIGRATIONS\G\GRANT LINE\16151\PA-1900127\SU0012397\CDD OK.PDF \MIGRATIONS\G\GRANT LINE\16151\PA-1900127\SU0012397\EH COND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
31SJCOG, Inc. <br /> S JC0G,Inc. <br /> San Joaluiu County Ahiln-S f rdrr HaNtnt Cauentatiou&%ru.Space Plan <br /> 555 East Weber Avenue•Stockton,CA 95202•(209)235-0600• FAX(209)235-0438 <br /> SJ6\4SCP HOLD <br /> TO: Local Jurisdiction: Community Development Department,Planning Department,Building <br /> Department, Engineering Department,Survey Department,Transportallon Department, <br /> Other: <br /> FROM: Laurel Boyd,SJCOG,Inc. <br /> DO NOT AUTHORIZE SITE DISTURBANCE <br /> DO NOT ISSUE A BUILDING PERMIT <br /> ISO NOT ISSUE FOR THIS PROJECT <br /> The landowner/developer for this site has requested coverage pursuant to the San Joaquin County Multi- <br /> Species Habitat Conservation and Open Space Plan(SJMSCP). In accordance with that agreement,the <br /> Applicant has agreed to: <br /> 1) SJMSCP Incidental Take Minimization Measures and mitigation requirement: <br /> 1. Incidental Take Minimization Measures(ITMMs)will be issued to the project and must be signed by the <br /> project applicant prior to any ground disturbance but no later than six(6)months from receipt of the ITMMs. <br /> If ITMMs are not signed within six months,the applicant must reapply for SJMSCP Coverage. Upon receipt <br /> orsigned ITMMs from project applicant,SJCOG,Inc,staff will sign the ITMMs.This is the effective date <br /> of the ITMMs. <br /> 2. Under no circumstance shall ground disturbance occur without compliance and satisfaction of the ITMMs. <br /> 3, Upon issuance of fully executed ITMMs and prior to any ground disturbance,the project applicant must•. <br /> r € j a. Post a bond for payment of the applicable SJMSCP fee covering the entirety of the project acreage <br /> beingcovered the bond should be valid for no longer than a 6 month period);or <br /> b. Pay te appropriate SJMSCP fee for the entirety of the project acreaacreagebeing covered;or <br /> c. Dedicate land in-lieu of tees,either as conservation casements or fee title;or <br /> d. Purchase approved mitigation bank credits. <br /> 4. Within 6 months fiom the effective date of the rl'MMs or issuance ofa building permit,whichever occurs <br /> first,the project applicant must: <br /> a. Pay the appropriate SJMSCP for the entirety of the project acreage being covered;or <br /> b. Dedicate land in-lice of fees,either as conservation easements or fee title;or <br /> c. Purchase approved mitigation bank credits. <br /> ' Failure to satisfy the obligations of the mitigation fee shall subject the bond to be called. <br /> ( <br /> y /,E Project Title:PA-1900127(UP) <br /> t <br /> Landowner: Dharm Singh Applicant: Sukhiit'Tony'Singh <br /> k 5 Assessor Parcel#s:209-190-33 <br /> T ,R ,Section(s): <br /> Local Jurisdiction Contact:Alisa Goularl <br /> The LOCAL JURISDICTION retains responsibility for ensuring that the appropriate <br /> Incidental Take Minimization Measures are properly implemented and monitored and that <br /> appropriate fees are paid in compliance with the SJMSCP. <br />
The URL can be used to link to this page
Your browser does not support the video tag.