Laserfiche WebLink
1-4. Single Phase Developa <br /> Start of Construction(Mon(h;Year): Gross Acres: <br /> End of Construction(Month/Year): — _ -- — --' Net Acres(area devoted to buildings/structures): <br /> First Date of Occupati0u(Month/fear): Paved Parking Area(ti of Spaces): - <br /> Building Square Footage: Number of*Dwelling Units: ---- <br /> J. On-Site Air Pollution Reductions(Mitigation Measures) <br /> Listed below are categories of possible mitigalion measures that will reduce a project's impact on air quality. If a category is <br /> applicable to the project,check-,Yes",and please complete(he corresponding page to identify specilic mitigation measures within <br /> that category, If a category is not applicable to the project,check•'Nu'. _ <br /> I. Construction Clean Fleet(making a commitment to using a construction fleet that will achieve the emission reductions required by <br /> District Rule 95 10) <br /> ❑ Yes,please cmnplete nritigutiorr measure I <br /> ® No <br /> 2. Land Use/Location (e.g.increased density,improve walkability design,increase transit,etc.) <br /> ❑ Yes,please complele applic•nhle mitigation measures 2a through 2f <br /> ® No <br /> 3, Neighborhoud,Site Enhancements(e.g.improve pcdestrial network,t•al'fic calming nteasureS,NISV network,etc.) <br /> ❑ Yes,please complete appUcahle miligallon measm•es 3a t!u•ough 3c <br /> ® No <br /> 4. Parking PolieyiPricing(e.g,parking cost,on-street market pricing,limit parking supply,etc.) <br /> ❑ Yes, please complete«ppliccthlc rniri•afion treasure da dn•ough-!e <br /> ® No <br /> 5. Commute Trip Reduction Programs(e.g,workplace parking chm•ge,employee vanpool/shuttle,ride sharia;program,elc,) <br /> ❑ Yes,please complele applic•uble mhl,,alion measures is fhrurrglr SJ <br /> IN No <br /> 6. Building Design(e.g.wo0dstovcs or fireplaces) -----------�-----_ �._ <br /> ❑ Yes,please complele rniligalian measure 6 <br /> 19 No <br /> 7. Building Energy(e.g.exceed title 24,electrical maintenance equipment) <br /> ® Yes,please complele applicable rulttgwlun measures 7a through 7h <br /> ❑ No <br /> S.Solar Panels(e.g.incorporate solar panels in the prgjcci) ; <br /> ❑ Yes,please complele applicable mitigation meosure 8 <br /> No <br /> 9.Electric Vehicle(EV)Charger(e.g.incorporate EV charger(s)in the project) <br /> ® Yes,please cnrrtp .,lc applicable nritigutiorr treasure 9 <br /> ❑ No <br /> K. Review Period �m <br /> You may request a five(5)day period to review a drill of the District's analysis of your project belore it is finalized. However,if you <br /> choose(his option,it will delay the project's finalization by live(5)business days. <br /> ❑ I reques(to review a draft of the District's analysis. 1 <br /> Cenral Region Office: 1990 E.Gettysburg Ave.Fresno,CA 93725.0244 TEL(559)230-0000 FAX(559)230-6061 WED www.vallevair.org <br /> Wage 3 of 12 ResidenrialiNon-Residential/Mixed-Use Application Form Revised June 28,20151 <br />