My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012397
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
16151
>
2600 - Land Use Program
>
PA-1900127
>
SU0012397
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2020 8:52:23 AM
Creation date
9/5/2019 10:43:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012397
PE
2626
FACILITY_NAME
PA-1900127
STREET_NUMBER
16151
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95304-
APN
209191033
ENTERED_DATE
6/28/2019 12:00:00 AM
SITE_LOCATION
16151 W GRANT LINE RD
RECEIVED_DATE
6/17/2019 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
TSok
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\16151\PA-1900127\SU0012397\APPL.PDF \MIGRATIONS\G\GRANT LINE\16151\PA-1900127\SU0012397\CDD OK.PDF \MIGRATIONS\G\GRANT LINE\16151\PA-1900127\SU0012397\EH COND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, <br /> Ms.Alisa Goulart <br /> San Joaquin County Community Development Department <br /> February 11,2020 <br /> Page 2 <br /> Endangered Species Act(CESA)(Fish and Game Code,§2050 et seq.),the Project proponent <br /> may seek related take authorization as provided by the Fish and Game Code. <br /> PROJECT DESCRIPTION SUMMARY <br /> Proponent:Dharm Singh/Sukhjit"Tony"Singh <br /> Location: 16151 W.Grant Line Road in the City of Tracy,San Joaquin County,California, <br /> Assessor's Parcel Number(s)209-190-33 and 209-190-40.The Project is located on the north <br /> side of W.Grant Line Road,985 feet east of S.Hansen Road,northwest of(lie City of Tracy, <br /> Timeframe:Two(2)construction phases over four(4)years. <br /> Description:The Project proposes to expand an existing religious assembly from a maximum <br /> of 170 members to a maximum of 700 members in two phases over four years.Phase 1 <br /> includes the construction of a 28,965-square-foot(sf)assembly hall,a 250 sf well house,a 700 <br /> sf water pump house for fire,a 6,453 sf porch and hallway structure to connect the proposed <br /> assembly hall with a future social hall,and the conversion of an existing 6,150 sf agricultural <br /> building Into a storage building.Phase 2 includes the construction of a two-story,17,715 sf <br /> social hall with a kitchen and dining area,and an upstairs area for retreat and guest preachers. <br /> The site plan proposes three driveways off West Grant Line Road.Currently,the religious <br /> assembly utilizes,and will continue to utilize,a 4,920 sf assembly hall,a 2,500 sf office and <br /> visitor's quarters,a 1,409 sf garage and office,a 4,250 sf parsonage,and a 96 sf storage <br /> building. <br /> COMMENTS AND RECOMMENDATIONS <br /> CDFW offers the comments and recommendations below to assist San Joaquin County <br /> Community Development Department in adequately identifying and/or mitigating the Project's <br /> significant,or potentially significant,direct and indirect impacts on fish and wildlife(biological) <br /> resources.Editorial comments or other suggestions may also be included to improve the <br /> document. Based on the Project's avoidance of significant impacts on biological resources with <br /> implementation of mitigation measures,CDFW concludes that a Mitigated Negative Declaration <br /> is appropriate for the Project. <br /> Comment 1:Revision needed to mitigate impacts from Project phasing to less-than- <br /> significant <br /> The IS/MND does not include a description of timeframe or period(luring which construction will <br /> occur.Project activities may have additional significant biological impacts due to Project phasing <br /> over time.Phasing and the additional impacts from phasing are not discussed,analyzed,or <br /> mitigated for in the IS/MND.Projects that include multiple phases with different sections or <br /> parcels built out at different time periods or phasing that includes whole-site grading with <br /> separate sections or parcels developed at later dates have impacts over a period longer than <br /> one year.This delay in full build out of a Project allows wildlife to utilize resources that develop <br /> post-grading on vacant sections or parcels.These resources include, but are not limited to; <br />
The URL can be used to link to this page
Your browser does not support the video tag.